Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
2406 S CLOVIS PL
Address NEW:
2406 S CLOVIS PL
Apply Date:
09/15/2023
Applicant:
Description:
SFR PANT2022 T22-M0073

Permit Reviews

Permit Number - TC-MDP-0123-00299
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Start Date Submittal Complete Date Status  
11/02/2023 SITE FROM MODEL PERMIT - PRODUCTION v.4 11/07/2023 APPROVED Review Details
11/01/2023 SITE FROM MODEL PERMIT - PRODUCTION v.3 11/02/2023 REQUIRES RESUBMIT Review Details
09/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/19/2023 REQUIRES RESUBMIT Review Details
10/25/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 10/25/2023 REQUIRES RESUBMIT Review Details
04/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/16/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0123-00299
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Date Description Comments
09/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/18/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00299
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/11/2024 COT - RSPL - Rough Soil Passed
01/11/2024 COT - RSPL - Yard Water Line Passed
01/11/2024 COT - RSPL - Sewer Passed
01/19/2024 COT - RSBU - Preslab Passed
01/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/19/2024 COT - RSEL - Grounding/Bonding Passed
02/15/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/15/2024 COT - RSBU - Roof Nailing Passed
02/28/2024 BULD - Electrical Clearance Passed TEP ECO
02/28/2024 COT - RSEL - Electrical Underground Passed
05/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/14/2024 COT - RSBU - Interior Shear Bracing Passed
04/03/2025 COT - BULD - SWG Clearance Passed Passed final 4/3/25
04/03/2025 COT - RSEL - Electrical Final Passed Passed final 4/3/25
04/03/2025 COT - RSEL - Outdoor Lighting Passed Passed final 4/3/25
04/03/2025 COT - RSME - Mechanical Final Passed Passed final 4/3/25
04/03/2025 COT - RSPL - Gas Pressure Test Passed Passed final 4/3/25
04/03/2025 COT - RSPL - Plumbing Final Passed Passed final 4/3/25
04/03/2025 ENGR Engineering Final Passed CO READY
04/03/2025 RSBU - Building Final Passed Passed final 4/3/25
04/03/2025 RSBU - Building Progress Passed Passed final 4/3/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SI CERT LOT 7.1-2025-04-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 7 RESPONCE LETTER 11.2.2023_V1.PDF DOCUMENTS VIEW
SITE PLAN LOT 7 2406 S CLOVIS 1_V1.PDF DOCUMENTS VIEW