Permit: TC-MDP-0123-00297
Permit Details
Apply Date:
12/05/2022
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00297
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | REQUIRES RESUBMIT |
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/21/2024 | APPROVED |
03/06/2023 | RESIDENTIAL NEW DWELLING v.2 | 03/10/2023 | APPROVED |
02/16/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/02/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0123-00297
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Date | Description | Comments |
---|---|---|
02/17/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
10/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/17/2023 | Post-Tension Inspection Report is required. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/15/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/15/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
02/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00297
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas to this subdivision. |
10/09/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas to this subdivision. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00297
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 17
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/13/2023 | COT - RSPL - Rough Soil | Passed | ||
04/18/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/02/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/02/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
05/02/2023 | COT - RSBU - Preslab | Passed | ||
06/14/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior sheathing is properly nailed off, H2.5 clips are properly installed holding trusses to the top plate of exterior walls. | |
06/14/2023 | COT - RSBU - Roof Nailing | Passed | Roof is properly nailed off. Truss calc's are on-site and rat runners are properly placed. | |
07/11/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/22/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
11/13/2023 | BULD - Electrical Clearance | Passed | Approved new service panel, ECO Clearance to TEP is required | |
12/19/2023 | COT - RSPL - Sewer | Passed | ||
05/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
07/11/2024 | COT - RSME - Mechanical Final | Passed | ||
07/11/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
07/11/2024 | COT - RSEL - Electrical Final | Passed | ||
07/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/11/2024 | RSBU - Building Final | Passed |