Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
2445 S CLOVIS PL
Address NEW:
2445 S CLOVIS PL
Apply Date:
09/21/2023
Applicant:
Description:
SFR PANT2022 T22-M0073

Permit Reviews

Permit Number - TC-MDP-0123-00295
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Start Date Submittal Complete Date Status  
09/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 10/03/2023 APPROVED Review Details
02/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2025 APPROVED Review Details
09/22/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/27/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0123-00295
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
Date Description Comments
09/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/05/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/06/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00295
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/26/2023 COT - RSPL - Backwater Valve N/A Canceled Canceled per wet soils. 12/26/2023
12/26/2023 COT - RSPL - Sewer N/A Canceled Canceled per wet soils. 12/26/2023
08/26/2024 COT - BULD - SWG Clearance N/A Not Applicable Not Applicable--No Gas onsite.
08/26/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not Applicable--No Gas onsite.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00295
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 19
Date Description Inspector Results Comments
11/01/2023 COT - RSPL - Rough Soil Passed
11/02/2023 COT - RSPL - Yard Water Line Passed
11/16/2023 COT - RSEL - Grounding/Bonding Passed
11/16/2023 COT - RSBU - Preslab Passed
11/16/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/28/2023 COT - RSPL - Backwater Valve Passed
12/28/2023 COT - RSPL - Sewer Passed
01/08/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
01/08/2024 COT - RSBU - Roof Nailing Passed
01/31/2024 BULD - Electrical Clearance Passed TEP ECO
01/31/2024 COT - RSEL - Electrical Underground Passed
03/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/25/2024 COT - RSBU - Interior Shear Bracing Passed
08/26/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plan and city requirements.
02/03/2025 RSBU - Building Final Passed 2/3/25 pass
02/03/2025 COT - RSEL - Electrical Final Passed 2/3/25 pass
02/03/2025 ENGR Engineering Final Passed
02/03/2025 COT - RSPL - Plumbing Final Passed 2/3/25 pass
02/03/2025 COT - RSME - Mechanical Final Passed 2/3/25 pass

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
SI CERT LOT 25.1-2025-02-05_V1.PDF DOCUMENTS VIEW
SI REPORT 8 11-16-23 BLDGS 25,26-2025-02-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SI CERT LOT 25_V1.PDF DOCUMENTS VIEW
SITE PLAN LOT 25 00295_V2.PDF DOCUMENTS VIEW