Permit: TC-MDP-0123-00294
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2397 S CLOVIS PL
Address NEW:
2397 S CLOVIS PL
Apply Date:
01/04/2024
Applicant:
Description:
SFR PANT2022 T22-M0073
Permit Reviews
Permit Number - TC-MDP-0123-00294
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/16/2025 | APPROVED |
| 02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
| 01/04/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/16/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0123-00294
Permit Status: Complete
Permit Description: SFR PANT2022 T22-M0073
| Date | Description | Comments |
|---|---|---|
| 01/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/12/2024 | Post-Tension Inspection Report is required. | |
| 01/04/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 01/12/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00294
Permite Description: SFR PANT2022 T22-M0073
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/22/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 04/09/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 4-9-25, not applicable. |
| 04/09/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 4-9-25, not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00294
Permit Description: SFR PANT2022 T22-M0073
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 03/14/2024 | COT - RSPL - Rough Soil | Passed | ||
| 03/14/2024 | COT - RSPL - Sewer | Passed | ||
| 03/14/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 03/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/22/2024 | COT - RSBU - Preslab | Passed | ||
| 05/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Bottom plates are properly secured to concrete floor with masa clips or ab bolts. Plywood sheathing for exterior shear walls is properly nailed per plans and code. Shear wall straps are installed and properly secured with nails to wall framing. Okay to proceed. | |
| 05/13/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with H2.5 clips and plywood sheathing is properly nailed to the trusses per plans and code. | |
| 05/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/17/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued. | |
| 07/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/16/2024 | RSBU - Building Progress | Passed | ||
| 04/09/2025 | COT - RSEL - Electrical Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | COT - RSEL - Outdoor Lighting | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | COT - RSME - Mechanical Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | COT - RSPL - Plumbing Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. | |
| 04/09/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 04/09/2025 | RSBU - Building Final | Passed | 4-9-25, outdoor lighting, electrical, mechanical, plumbing and building final approved. |