Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
9125 E CATALINA HY
Apply Date:
01/10/2023
Applicant:
Kevin Flaherty
Description:
GARAGE BLDG 3 CASITAGARAGE T20-M0047

Permit Reviews

Permit Number - TC-MDP-0123-00291
Permit Status: Complete
Permit Description: GARAGE BLDG 3 CASITAGARAGE T20-M0047
Start Date Submittal Complete Date Status  
01/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/24/2024 APPROVED Review Details
01/17/2023 RESIDENTIAL NEW DWELLING v.1 01/27/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0123-00291
Permit Status: Complete
Permit Description: GARAGE BLDG 3 CASITAGARAGE T20-M0047
Date Description Comments
01/27/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
01/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/27/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/27/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/27/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/27/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00291
Permit Description: GARAGE BLDG 3 CASITAGARAGE T20-M0047
Total Completed Inspections - 14
Date Description Inspector Results Comments
06/22/2023 COT - RSPL - Yard Water Line Passed
09/18/2023 COT - RSPL - Rough Soil Passed
09/18/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/18/2023 COT - RSBU - Roof Nailing Passed
10/10/2023 COT - RSEL - Grounding/Bonding Passed
10/11/2023 BULD - Electrical Clearance Passed 9125E Catalina Hy Garage 3, TEP ECO
10/24/2023 COT - RSBU - Interior Shear Bracing Passed
10/30/2023 COT - RSME - Mechanical Final Passed
12/14/2023 RSBU - Building Final Passed
12/14/2023 COT - RSPL - Plumbing Final Passed
12/14/2023 COT - RSEL - Electrical Final Passed
12/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/08/2024 ENGR Engineering Final Passed
01/10/2024 COT - RSBU - Preslab Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
IE COC GARAGE JOIST LETTER 01.23.24_V1.PDF DOCUMENTS VIEW
PT GARAGE 3 COMPLETE-2024-01-23_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SIC GARAGE BUILDING 3-2023-01-12_V1.PDF DOCUMENTS VIEW
CASITAS ON CATALINA - SITE PLAN GARAGE BUILDING 3_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW