Permit: TC-MDP-0123-00291
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY
Address NEW:
9125 E CATALINA HY
Apply Date:
01/10/2023
Applicant:
Kevin Flaherty
Description:
GARAGE BLDG 3 CASITAGARAGE T20-M0047
Permit Reviews
Permit Number - TC-MDP-0123-00291
Permit Status: Complete
Permit Description: GARAGE BLDG 3 CASITAGARAGE T20-M0047
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
| 01/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/27/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0123-00291
Permit Status: Complete
Permit Description: GARAGE BLDG 3 CASITAGARAGE T20-M0047
| Date | Description | Comments |
|---|---|---|
| 01/27/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 01/27/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/27/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/27/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/27/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 01/27/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0123-00291
Permit Description: GARAGE BLDG 3 CASITAGARAGE T20-M0047
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 09/18/2023 | COT - RSPL - Rough Soil | Passed | ||
| 09/18/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 10/10/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/11/2023 | BULD - Electrical Clearance | Passed | 9125E Catalina Hy Garage 3, TEP ECO | |
| 10/24/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/30/2023 | COT - RSME - Mechanical Final | Passed | ||
| 12/14/2023 | RSBU - Building Final | Passed | ||
| 12/14/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 12/14/2023 | COT - RSEL - Electrical Final | Passed | ||
| 12/26/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 01/08/2024 | ENGR Engineering Final | Passed | ||
| 01/10/2024 | COT - RSBU - Preslab | Passed |