Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0123-00285
Permit Details
Apply Date:
08/15/2023
Applicant:
Russ Salmon
Description:
LE23001 T22-M0058
Permit Reviews
Permit Number - TC-MDP-0123-00285
Permit Status: Inspections complete
Permit Description: LE23001 T22-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/16/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00285
Permit Status: Inspections complete
Permit Description: LE23001 T22-M0058
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/16/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/16/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/17/2023 | Post-Tension Inspection Report is required. |
08/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0123-00285
Permit Status: Inspections complete
Permit Description: LE23001 T22-M0058
Date | Description | Comments |
---|---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00285
Permite Description: LE23001 T22-M0058
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/30/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Missing anchor bolts at garage shear wall, add shot pins to 2x6 sole plate at master shower, truss A03 at back of house missing rat runs and missing stud to carry load down to sole plate per truss calcs. |
01/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Plumbing and electrical not per plans. Revise plans to show current electrical and plumbing work done and provide at final. Partial-pass. Ok to proceed at risk per supervisor Ernie Stevens. |
04/22/2024 | RSBU - Building Final | N/A | Re-inspection required | Missing outlet receptacles in garage and refrigerator must run on its own circuit per E1 plans, missing cleanouts at bathrooms per P1 plans per Residential Intermediate inspection. Make proper corrections according to plans or revise plans showing current layout of electric and plumbing work done and provide updated city stamped plans at Final re-inspect. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00285
Permit Description: LE23001 T22-M0058
Total Completed Inspections - 24