Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/09/2023
Applicant:
Richard Willard
Description:
LE23001 T22-M0058

Permit Reviews

Permit Number - TC-MDP-0123-00278
Permit Status: Issued
Permit Description: LE23001 T22-M0058
Start Date Submittal Complete Date Status  
01/31/2023 RESIDENTIAL NEW DWELLING v.1 02/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00278
Permit Status: Issued
Permit Description: LE23001 T22-M0058
Total Outstanding Activity Conditions - 8
Date Name
02/01/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/01/2023 Post-Installed Anchor Inspection Report is required.
02/01/2023 Post-Tension Inspection Report is required.
02/01/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0123-00278
Permit Description: LE23001 T22-M0058
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/17/2023 COT - RSPL - Rough Soil Passed
02/27/2023 COT - RSBU - Preslab Passed okay for concrete in slab
02/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
02/27/2023 COT - RSEL - Grounding/Bonding Passed
03/16/2023 COT - RSBU - Roof Nailing Passed
03/16/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/04/2023 COT - RSPL - Sewer Passed
04/07/2023 BULD - Electrical Clearance Passed TEP ECO
06/01/2023 RSBU - Building Progress Passed
06/01/2023 COT - RSPL - Gas Pressure Test Passed
06/01/2023 RSEL - Electrical Progress Passed
06/01/2023 RSME - Mechanical Progress Passed
06/01/2023 RSPL - Plumbing Progress Passed
06/01/2023 COT - RSPL - Yard Water Line Passed
06/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/09/2023 COT - RSBU - Interior Shear Bracing Passed 6/9/23: on shear wall plan, location of window shows differently than on other sheets. Clarify and coordinate all sheets for future inspections.
08/17/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
08/30/2023 RSBU - Building Final Passed
08/30/2023 COT - RSEL - Electrical Final Passed
08/30/2023 COT - RSEL - Outdoor Lighting Passed
08/30/2023 COT - RSME - Mechanical Final Passed
08/30/2023 COT - RSPL - Plumbing Final Passed
08/30/2023 COT - RSPL - Gas Final Passed