Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/11/2023
Applicant:
Russ Salmon
Description:
SFR LE23003 T22-M0056

Permit Reviews

Permit Number - TC-MDP-0123-00262
Permit Status: Inspections complete
Permit Description: SFR LE23003 T22-M0056
Start Date Submittal Complete Date Status  
09/12/2023 RESIDENTIAL NEW DWELLING v.1 09/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00262
Permit Status: Inspections complete
Permit Description: SFR LE23003 T22-M0056
Total Outstanding Activity Conditions - 6
Date Name
07/10/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/12/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/12/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/12/2023 Post-Tension Inspection Report is required.
09/12/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/12/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0123-00262
Permit Status: Inspections complete
Permit Description: SFR LE23003 T22-M0056
Date Description Comments
09/14/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
07/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00262
Permite Description: SFR LE23003 T22-M0056
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
11/01/2023 COT - RSPL - Yard Water Line N/A Re-inspection required Not under test.
05/24/2024 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
05/24/2024 COT - RSBU - Masonry Pregrout N/A Not Applicable
05/24/2024 COT - RSBU - Stem Wall/Retaining Wall N/A Not Applicable
05/24/2024 COT - RSME - Hydronic Piping N/A Not Applicable
05/24/2024 COT - RSME - Mechanical Underground N/A Not Applicable
05/24/2024 COT - RSMH - Mobile/Mod Home Electrical N/A Not Applicable
05/24/2024 COT - RSMH - Mobile/Mod Home Final N/A Not Applicable
05/24/2024 COT - RSMH - Mobile/Mod Home Gas N/A Not Applicable
05/24/2024 COT - RSMH - Mobile/Mod Home Plumbing N/A Not Applicable
05/24/2024 COT - RSPL - Gas Reconnect N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00262
Permit Description: SFR LE23003 T22-M0056
Total Completed Inspections - 26
Date Description Inspector Results Comments
11/01/2023 COT - RSPL - Rough Soil Passed
11/01/2023 COT - RSPL - Sewer Passed
11/07/2023 COT - RSBU - Preslab Passed
11/07/2023 COT - RSEL - Electrical Underground Passed
11/17/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Missing king studs at each end of dining window.
11/17/2023 COT - RSBU - Roof Nailing Passed
02/28/2024 RSEL - Electrical Progress Passed
02/28/2024 RSME - Mechanical Progress Passed
02/28/2024 RSPL - Plumbing Progress Passed
02/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/29/2024 COT - RSPL - Gas Pressure Test Passed
02/29/2024 RSBU - Building Progress Passed
03/08/2024 COT - RSPL - Yard Water Line Passed
03/08/2024 COT - RSBU - Interior Shear Bracing Passed
04/08/2024 BULD - Electrical Clearance Passed
05/08/2024 COT - BULD - SWG Clearance Passed
05/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/23/2024 ENGR Engineering Final Passed
05/23/2024 COT - RSPL - Gas Final Passed
05/23/2024 COT - RSPL - Plumbing Final Passed
05/23/2024 COT - RSME - Mechanical Final Passed
05/24/2024 COT - RSEL - Grounding/Bonding Passed
05/24/2024 COT - RSEL - Outdoor Lighting Passed
05/24/2024 COT - RSPL - Backwater Valve Passed
05/28/2024 COT - RSEL - Electrical Final Passed
05/28/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LEC 20 APP_V1.PDF DOCUMENTS VIEW
LEC 20 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LEC 20 SIC-2023-09-11_V1.PDF DOCUMENTS VIEW