Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
12/06/2022
Applicant:
Russ Salmon
Description:
SFR LE23003 T22-M0056

Permit Reviews

Permit Number - TC-MDP-0123-00259
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056
Start Date Submittal Complete Date Status  
01/12/2023 RESIDENTIAL NEW DWELLING v.1 01/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00259
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056
Total Outstanding Activity Conditions - 2
Date Name
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0123-00259
Permite Description: SFR LE23003 T22-M0056
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6-15-24: 1-Need second receptacle for second bay of garage on dedicated circuit. 2-Smoke detector missing outside front bedroom. 3- Fire block duct chase upstairs per Code.

6/16/23: Need second receptacle for second bay of garage on dedicated circuit, Fire block duct chase upstairs per Code.

6/20/23: Nail plate on solar water heater pipe in closet on second floor.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0123-00259
Permit Description: SFR LE23003 T22-M0056
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/03/2023 COT - RSPL - Rough Soil Passed
02/03/2023 COT - RSPL - Yard Water Line Passed
02/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
02/09/2023 COT - RSBU - Preslab Passed
02/09/2023 COT - RSEL - Electrical Underground Passed
02/09/2023 COT - RSEL - Grounding/Bonding Passed
03/20/2023 COT - RSBU - Roof Nailing Passed
03/20/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/30/2023 COT - RSPL - Sewer Passed
06/15/2023 COT - RSPL - Gas Pressure Test Passed
06/15/2023 RSPL - Plumbing Progress Passed
06/20/2023 RSBU - Building Progress Passed
06/20/2023 RSME - Mechanical Progress Passed
06/21/2023 RSEL - Electrical Progress Passed
06/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/28/2023 COT - RSBU - Interior Shear Bracing Passed
06/30/2023 BULD - Electrical Clearance Passed ECO for TEP
09/05/2023 COT - BULD - SWG Clearance Passed 9/5/23: SWG CLEARANCE FOR METER
10/06/2023 COT - RSME - Mechanical Final Passed
10/06/2023 RSBU - Building Final Passed
10/06/2023 COT - RSPL - Plumbing Final Passed
10/06/2023 COT - RSPL - Gas Final Passed
10/06/2023 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-LE2-5, 73 4003 CL9_V1_V1.PDF DOCUMENTS VIEW
LE2-5, 73_4003 MODEL MASTER_V1_V1.PDF DOCUMENTS VIEW
LE2-5, 73_4003 SIC-2022-12-06_V1-2023-01-12_V1.PDF DOCUMENTS VIEW