Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/18/2023
Applicant:
John Sutton
Description:
SFR LE23004 T22-M0055

Permit Reviews

Permit Number - TC-MDP-0123-00256
Permit Status: Inspections complete
Permit Description: SFR LE23004 T22-M0055
Start Date Submittal Complete Date Status  
09/19/2023 RESIDENTIAL NEW DWELLING v.1 09/20/2023 APPROVED Review Details
09/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00256
Permit Status: Inspections complete
Permit Description: SFR LE23004 T22-M0055
Total Outstanding Activity Conditions - 6
Date Name
07/10/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/20/2023 Post-Tension Inspection Report is required.
09/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0123-00256
Permit Status: Inspections complete
Permit Description: SFR LE23004 T22-M0055
Date Description Comments
09/21/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
07/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00256
Permit Description: SFR LE23004 T22-M0055
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/04/2023 COT - RSPL - Rough Soil Passed Underground plumbing is connected to the main sewer line. Okay to shade pipes and backfill trenches.
12/04/2023 COT - RSPL - Sewer Passed Underground plumbing is connected to the main sewer line. Okay to shade pipes and backfill trenches.
12/04/2023 COT - RSPL - Yard Water Line Passed water line is connected to meter and fully operational.
12/11/2023 COT - RSBU - Preslab Passed
12/11/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/11/2023 COT - RSEL - Electrical Underground Passed
01/10/2024 COT - RSBU - Roof Nailing Passed
01/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed
03/21/2024 COT - RSPL - Gas Pressure Test Passed
03/21/2024 RSBU - Building Progress Passed
03/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/10/2024 COT - RSBU - Interior Shear Bracing Passed
06/05/2024 BULD - Electrical Clearance Passed
06/20/2024 COT - BULD - SWG Clearance Passed
07/03/2024 COT - RSEL - Electrical Final Passed
07/03/2024 COT - RSEL - Grounding/Bonding Passed
07/03/2024 COT - RSEL - Outdoor Lighting Passed
07/03/2024 COT - RSME - Mechanical Final Passed
07/03/2024 COT - RSPL - Plumbing Final Passed
07/03/2024 ENGR Engineering Final Passed
07/03/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LEC 14 APP_V1.PDF DOCUMENTS VIEW
LEC 14 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LEC 14 SIC-2023-09-18_V1.PDF DOCUMENTS VIEW