Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/09/2023
Applicant:
Troy Staiger
Description:
SFR LE23004 T22-M0055

Permit Reviews

Permit Number - TC-MDP-0123-00250
Permit Status: Complete
Permit Description: SFR LE23004 T22-M0055
Start Date Submittal Complete Date Status  
03/24/2023 RESIDENTIAL NEW DWELLING v.1 03/27/2023 APPROVED Review Details
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0123-00250
Permit Status: Complete
Permit Description: SFR LE23004 T22-M0055
Date Description Comments
03/27/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/27/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/27/2023 Post-Installed Anchor Inspection Report is required.
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/27/2023 Soil Testing
03/27/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0123-00250
Permit Description: SFR LE23004 T22-M0055
Total Completed Inspections - 24
Date Description Inspector Results Comments
04/26/2023 COT - RSPL - Rough Soil Passed Underground plumbing is under water test and holding. Okay to backfill trenches and compact for concrete slab.
04/26/2023 COT - RSPL - Sewer Passed DWV is connected into sewer line. 2 way clean out outside of building envelope.
04/26/2023 COT - RSPL - Yard Water Line Passed Water supply line under air test and holding 50+# of compressed air.
05/04/2023 COT - RSEL - Grounding/Bonding Passed
05/04/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/04/2023 COT - RSEL - Electrical Underground Passed
05/18/2023 COT - RSBU - Roof Nailing Passed
08/23/2023 RSBU - Building Progress Passed
08/23/2023 COT - RSBU - Exterior Clips/Sheathing Passed
08/23/2023 COT - RSPL - Gas Pressure Test Passed
08/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/23/2023 RSEL - Electrical Progress Passed
08/23/2023 RSME - Mechanical Progress Passed
08/23/2023 RSPL - Plumbing Progress Passed
09/01/2023 COT - RSBU - Interior Shear Bracing Passed 9/1/23: ok to proceed
10/12/2023 BULD - Electrical Clearance Passed
11/14/2023 COT - BULD - SWG Clearance Passed Meter only.
12/04/2023 RSBU - Building Final Passed 12-4-23: Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. okay to issue Certificate of Occupancy.
12/04/2023 COT - RSEL - Electrical Final Passed 12-4-23: Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. okay to issue Certificate of Occupancy.
12/04/2023 COT - RSBU - Preslab Passed
12/04/2023 COT - RSEL - Outdoor Lighting Passed 12-4-23: Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. okay to issue Certificate of Occupancy.
12/04/2023 COT - RSME - Mechanical Final Passed 12-4-23: Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. okay to issue Certificate of Occupancy.
12/04/2023 COT - RSPL - Gas Final Passed 12-4-23: Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. okay to issue Certificate of Occupancy.
12/04/2023 COT - RSPL - Plumbing Final Passed 12-4-23: Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA DE TUCSON PHASE II 30S FINAL SIC - LOT 57-2024-03-07_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CLE 57 3004 SIC-2023-03-20_V1.PDF DOCUMENTS VIEW
CLE 57 3004AL11_V1.PDF DOCUMENTS VIEW