Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/27/2023
Applicant:
Russ Salmon
Description:
SFR LE23006 T22-M0054

Permit Reviews

Permit Number - TC-MDP-0123-00241
Permit Status: Inspections complete
Permit Description: SFR LE23006 T22-M0054
Start Date Submittal Complete Date Status  
06/29/2023 RESIDENTIAL NEW DWELLING v.1 07/04/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00241
Permit Status: Inspections complete
Permit Description: SFR LE23006 T22-M0054
Total Outstanding Activity Conditions - 6
Date Name
06/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/29/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/10/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0123-00241
Permit Status: Inspections complete
Permit Description: SFR LE23006 T22-M0054
Date Description Comments
06/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00241
Permite Description: SFR LE23006 T22-M0054
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/06/2023 RSEL - Electrical Progress N/A Re-inspection required 11/6/23: receptacle missing at kitchen countertop (per plans), seal top plate at entrance (gas going through top plate), seal chase at master, receptacle upstairs in bedroom facing west needs to be made up and wires secured, block all registers on three sides, refrigerant lines need to be brazed, block under upstairs loft, Up stairs bathroom flex duct not tied into register.
11/06/2023 RSME - Mechanical Progress N/A Re-inspection required 11/6/23: receptacle missing at kitchen countertop (per plans), seal top plate at entrance (gas going through top plate), seal chase at master, receptacle upstairs in bedroom facing west needs to be made up and wires secured, block all registers on three sides, refrigerant lines need to be brazed, block under upstairs loft, Up stairs bathroom flex duct not tied into register.
11/06/2023 RSPL - Plumbing Progress N/A Re-inspection required 11/6/23: receptacle missing at kitchen countertop (per plans), seal top plate at entrance (gas going through top plate), seal chase at master, receptacle upstairs in bedroom facing west needs to be made up and wires secured, block all registers on three sides, refrigerant lines need to be brazed, block under upstairs loft, Up stairs bathroom flex duct not tied into register.
11/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00241
Permit Description: SFR LE23006 T22-M0054
Total Completed Inspections - 25
Date Description Inspector Results Comments
07/26/2023 COT - RSPL - Sewer Passed
07/26/2023 COT - RSPL - Yard Water Line Passed
07/26/2023 COT - RSPL - Rough Soil Passed
08/09/2023 COT - RSBU - Preslab Passed
08/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/09/2023 COT - RSEL - Electrical Underground Passed
09/01/2023 COT - RSBU - Roof Nailing Passed
11/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/06/2023 COT - RSEL - Grounding/Bonding Passed
11/06/2023 RSBU - Building Progress Passed
11/06/2023 COT - RSPL - Gas Pressure Test Passed
11/09/2023 RSEL - Electrical Progress Passed
11/09/2023 RSME - Mechanical Progress Passed
11/09/2023 RSPL - Plumbing Progress Passed
11/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/04/2023 COT - RSBU - Interior Shear Bracing Passed Interior shear wall is properly screwed off. Okay to proceed with tape and texture.
01/30/2024 BULD - Electrical Clearance Passed
02/14/2024 COT - BULD - SWG Clearance Passed
02/26/2024 ENGR Engineering Final Passed
02/26/2024 COT - RSEL - Outdoor Lighting Passed
02/26/2024 COT - RSPL - Plumbing Final Passed
02/26/2024 RSBU - Building Final Passed
02/26/2024 COT - RSEL - Electrical Final Passed
02/26/2024 COT - RSME - Mechanical Final Passed
02/26/2024 COT - RSPL - Gas Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CLE 30 3006 BL8_V1.PDF DOCUMENTS VIEW
LE2_2_30 3006 MODEL MASTER_V1.PDF DOCUMENTS VIEW
LE2_2_30 3006 SIC-2023-06-27_V1.PDF DOCUMENTS VIEW