Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/26/2023
Applicant:
Russ Salmon
Description:
SFR LENNLE4002 T22-M0046

Permit Reviews

Permit Number - TC-MDP-0123-00233
Permit Status: Inspections complete
Permit Description: SFR LENNLE4002 T22-M0046
Start Date Submittal Complete Date Status  
07/26/2023 RESIDENTIAL NEW DWELLING v.1 08/01/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00233
Permit Status: Inspections complete
Permit Description: SFR LENNLE4002 T22-M0046
Total Outstanding Activity Conditions - 5
Date Name
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/26/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/26/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/26/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0123-00233
Permit Status: Inspections complete
Permit Description: SFR LENNLE4002 T22-M0046
Date Description Comments
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00233
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/21/2023 COT - RSPL - Rough Soil Passed
08/21/2023 COT - RSPL - Sewer Passed
08/21/2023 COT - RSPL - Yard Water Line Passed
09/05/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/05/2023 COT - RSBU - Preslab Passed 8/5/23: passed
09/05/2023 COT - RSEL - Electrical Underground Passed
09/05/2023 COT - RSEL - Grounding/Bonding Passed
09/21/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/21/2023 COT - RSBU - Roof Nailing Passed
12/06/2023 RSBU - Building Progress Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
12/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
12/06/2023 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of air pressure without leaks.
12/18/2023 COT - RSBU - Interior Shear Bracing Passed Interior shear walls are properly installed and screwed per plans. Okay to proceed with tape and texture of walls and ceilings.
02/02/2024 BULD - Electrical Clearance Passed
03/04/2024 COT - BULD - SWG Clearance Passed
03/13/2024 RSBU - Building Final Passed
03/13/2024 COT - RSEL - Electrical Final Passed
03/13/2024 COT - RSEL - Outdoor Lighting Passed
03/13/2024 COT - RSME - Mechanical Final Passed
03/13/2024 COT - RSPL - Gas Final Passed
03/13/2024 COT - RSPL - Plumbing Final Passed
03/20/2024 ENGR Engineering Final Passed Grade cert. passed no other concerns

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LE II 58 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LE2_5, 58_ 4002 MODEL MASTER_V1.PDF DOCUMENTS VIEW
LE2_5, 58_ 4002 SIC-2023-07-26_V1.PDF DOCUMENTS VIEW