Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
01/09/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4002 T22-M0046

Permit Reviews

Permit Number - TC-MDP-0123-00232
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Start Date Submittal Complete Date Status  
05/10/2023 RESIDENTIAL NEW DWELLING v.1 05/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0123-00232
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Total Outstanding Activity Conditions - 7
Date Name
05/15/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/15/2023 Post-Installed Anchor Inspection Report is required.
05/15/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0123-00232
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 20
Date Description Inspector Results Comments
06/29/2023 COT - RSPL - Rough Soil Passed
06/29/2023 COT - RSPL - Sewer Passed
06/29/2023 COT - RSPL - Yard Water Line Passed
07/20/2023 COT - RSBU - Preslab Passed
07/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/20/2023 COT - RSEL - Grounding/Bonding Passed
07/21/2023 COT - RSEL - Electrical Underground Passed
08/10/2023 COT - RSBU - Roof Nailing Passed
08/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/03/2023 BULD - Electrical Clearance Passed
10/24/2023 RSBU - Building Progress Passed
10/24/2023 COT - RSPL - Gas Pressure Test Passed
10/26/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Nail plates and fire foam needed at top plates of all low voltage, missing gfci receptacle at back wall for second parking space in garage, missing two receptacle outlets at left side of garage, missing hallway outlet receptacles by foyer and by office, missing nail plate by fridge, secure outlet in kitchen by range, revise plans by final.
11/08/2023 COT - RSBU - Interior Shear Bracing Passed
01/10/2024 COT - BULD - SWG Clearance Passed
02/08/2024 RSBU - Building Final Passed
02/08/2024 COT - RSEL - Electrical Final Passed
02/08/2024 COT - RSME - Mechanical Final Passed
02/08/2024 COT - RSPL - Gas Final Passed
02/08/2024 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LE2 80 4002 DR11_V1.PDF DOCUMENTS VIEW
LENNAR LETTERHEAD - LE 2-5, 80_V1.PDF DOCUMENTS VIEW
LE2_5, 80_ 4002 SIC-2023-05-06_V1.PDF DOCUMENTS VIEW
LE2_5, 80_ 4002 MODEL MASTER_V1.PDF DOCUMENTS VIEW