Permit: TC-MDP-0123-00221
Permit Details
Apply Date:
08/08/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4003 T22-M0047
Permit Reviews
Permit Number - TC-MDP-0123-00221
Permit Status: Issued
Permit Description: SFR LENNLE4003 T22-M0047
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/18/2023 | APPROVED |
08/09/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00221
Permit Status: Issued
Permit Description: SFR LENNLE4003 T22-M0047
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/09/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/09/2023 | Post-Installed Anchor Inspection Report is required. |
08/09/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/18/2023 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0123-00221
Permit Status: Issued
Permit Description: SFR LENNLE4003 T22-M0047
Date | Description | Comments |
---|---|---|
07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0123-00221
Permite Description: SFR LENNLE4003 T22-M0047
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/13/2023 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 10/13/23 plumbing not under test, main water line not under test. no plans |
02/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Electrical and plumbing not per plans. Make proper corrections according to plans or revise plans showing current layout of electric and plumbing work done and provide updated city stamped plans at Final. Partial-Pass. Ok to proceed at risk per Ernie Stevens. |
06/07/2024 | ENGR Engineering Final | N/A | Not Ready | large dip in grade at northwest side gate that needs regraded |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0123-00221
Permit Description: SFR LENNLE4003 T22-M0047
Total Completed Inspections - 21