Permit: TC-MDP-0123-00201
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6628 E VIA OLMEDA
Address NEW:
6628 E VIA OLMEDA
Apply Date:
06/27/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049
Permit Reviews
Permit Number - TC-MDP-0123-00201
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/12/2023 | RESIDENTIAL NEW DWELLING v.1 | 07/12/2023 | APPROVED |
| 06/29/2023 | RESIDENTIAL NEW DWELLING v.1 | 07/04/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0123-00201
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/29/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/29/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 07/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0123-00201
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
| Date | Description | Comments |
|---|---|---|
| 06/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0123-00201
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2023 | COT - RSPL - Rough Soil | Passed | ||
| 07/31/2023 | COT - RSPL - Sewer | Passed | ||
| 08/01/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 08/10/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/10/2023 | COT - RSBU - Preslab | Passed | ||
| 08/10/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 08/10/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/11/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/11/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 12/06/2023 | RSBU - Building Progress | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 12/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 12/06/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of air pressure without leaks. | |
| 12/18/2023 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls are properly installed and screwed per plans. Okay to proceed with tape and texture of walls and ceilings. | |
| 01/10/2024 | BULD - Electrical Clearance | Passed | ||
| 03/08/2024 | COT - BULD - SWG Clearance | Passed | ||
| 03/20/2024 | COT - RSEL - Electrical Final | Passed | ||
| 03/20/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/20/2024 | COT - RSME - Mechanical Final | Passed | ||
| 03/20/2024 | COT - RSPL - Gas Final | Passed | ||
| 03/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 03/22/2024 | ENGR Engineering Final | Passed | ||
| 03/22/2024 | RSBU - Building Final | Passed |