Permit Details

Status:
Inspections Complete
Type:
Factory Built Buildings
Apply Date:
10/25/2024
Applicant:
Brianna Quiroz
Description:
I'm applying for a structures permit so we can get temporary power at our construction trailer for our project manager. Please tie this to our approved temporary USE permit (TZ-PMT-0924-00066)

Permit Reviews

Permit Number - TC-FBB-1024-00191
Permit Status: Inspections complete
Permit Description: I'm applying for a structures permit so we can get temporary power at our construction trailer for our project manager. Please tie this to our approved temporary USE permit (TZ-PMT-0924-00066)
Start Date Submittal Complete Date Status  
10/29/2024 FACTORY BUILT BUILDINGS v.1 11/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-FBB-1024-00191
Permit Status: Inspections complete
Permit Description: I'm applying for a structures permit so we can get temporary power at our construction trailer for our project manager. Please tie this to our approved temporary USE permit (TZ-PMT-0924-00066)
Date Description Comments
10/29/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-FBB-1024-00191
Permit Description: I'm applying for a structures permit so we can get temporary power at our construction trailer for our project manager. Please tie this to our approved temporary USE permit (TZ-PMT-0924-00066)
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/09/2024 BULD - Electrical Clearance Passed 12-9-24, approved for power. ECO clearance issued to TEP.
12/09/2024 COT - RSEL - Grounding/Bonding Passed 12-9-24, grounding/bonding approved.
12/09/2024 COT - RSEL - Electrical Final Passed 12-9-24, grounding/bonding approved together with electrical final.
12/09/2024 RSBU - Building Final Passed 12-9-24, building final, grounding/bonding together with electrical final approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SITE PLAN LOT 25 ESCALERA (BLDG STRUCTURES PERMIT)_V1.PDF DOCUMENTS VIEW