Permit: TC-FBB-1023-00000
Permit Details
Apply Date:
10/12/2023
Applicant:
Charles Romero
Description:
Temporary power for job trailer off existing TEP transformer.
Permit Reviews
Permit Number - TC-FBB-1023-00000
Permit Status: Complete
Permit Description: Temporary power for job trailer off existing TEP transformer.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/12/2023 | FACTORY BUILT BUILDINGS v.1 | 11/03/2023 | APPROVED |
Conditions
Permit Number - TC-FBB-1023-00000
Permit Status: Complete
Permit Description: Temporary power for job trailer off existing TEP transformer.
| Date | Description | Comments |
|---|---|---|
| 10/12/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/02/2023 | Coordinate with State for the trailer inspection |
Completed Inspections
Permit Status: Complete
Permit Number: TC-FBB-1023-00000
Permit Description: Temporary power for job trailer off existing TEP transformer.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2024 | COT - RSEL - Electrical Final | Passed | Approved temporary service for construction trailer addressed 3476 S Kino PW, TMPP Clearance was called into TEP for the temporary power | |
| 01/02/2024 | BULD - Electrical Clearance | Passed | Approved temporary service for construction trailer addressed 3476 S Kino PW, TMPP Clearance was called into TEP for the temporary power | |
| 01/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 01/02/2024 | COT - RSEL - Grounding/Bonding | Passed | Approved temporary service for construction trailer addressed 3476 S Kino PW, TMPP Clearance was called into TEP for the temporary power | |
| 06/18/2024 | RSBU - Building Final | Passed | Approved to close temporary construction trailer permit (trailer and service will be removed) |