Permit Details

Status:
Inspections Complete
Type:
Factory Built Buildings
Address:
430 W ARAGON RD
Address NEW:
430 W ARAGON RD
Apply Date:
08/18/2026
Applicant:
Cathy Moreno
Description:
For use as a construction office during the renovation of an existing building. Construction is scheduled to begin in two weeks.

Permit Reviews

Permit Number - TC-FBB-0826-00109
Permit Status: Inspections complete
Permit Description: For use as a construction office during the renovation of an existing building. Construction is scheduled to begin in two weeks.
Start Date Submittal Complete Date Status  
08/31/2026 ADMINISTRATIVE v.1 08/31/2026 REQUIRES RESUBMIT Review Details
08/20/2026 FACTORY BUILT BUILDINGS v.1 08/31/2026 APPROVED Review Details

Conditions

Permit Number - TC-FBB-0826-00109
Permit Status: Inspections complete
Permit Description: For use as a construction office during the renovation of an existing building. Construction is scheduled to begin in two weeks.
Date Description Comments
08/31/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-FBB-0826-00109
Permite Description: For use as a construction office during the renovation of an existing building. Construction is scheduled to begin in two weeks.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/10/2026 BULD - Electrical Clearance N/A Not Applicable 9/10/26: not applicable.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-FBB-0826-00109
Permit Description: For use as a construction office during the renovation of an existing building. Construction is scheduled to begin in two weeks.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/10/2026 COT - RSEL - Grounding/Bonding Passed 9/10/26: grounding/bonding verified per plans.
09/10/2026 RSBU - Building Final Passed 9/10/26: install of construction trailer together with grounding/bonding approved.
09/10/2026 COT - LCEL - Construction Power Passed 9/10/26: approved.

Documents

File Name Document Type  
430 W ARAGON RD CONSTRUCTION OFFICE TEMPORARY POWER PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW