Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Factory Built Buildings
Address:
7157 S SWAN RD
Apply Date:
06/12/2024
Applicant:
Zachary Hollifield
Description:
Temporary jobsite trailer that will be on-site for the duration construction at 7157 S Swan Rd, Tuscon, AZ 85756.

Permit Reviews

Permit Number - TC-FBB-0624-00123
Permit Status: Needs resubmittal
Permit Description: Temporary jobsite trailer that will be on-site for the duration construction at 7157 S Swan Rd, Tuscon, AZ 85756.
Start Date Submittal Complete Date Status  
08/08/2024 FACTORY BUILT BUILDINGS v.3 08/08/2024 REQUIRES RESUBMIT Review Details
08/15/2024 FACTORY BUILT BUILDINGS v.4 08/30/2024 REQUIRES RESUBMIT Review Details
07/09/2024 FACTORY BUILT BUILDINGS v.1 07/09/2024 REQUIRES RESUBMIT Review Details
07/11/2024 FACTORY BUILT BUILDINGS v.2 08/01/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-FBB-0624-00123
Permit Status: Needs resubmittal
Permit Description: Temporary jobsite trailer that will be on-site for the duration construction at 7157 S Swan Rd, Tuscon, AZ 85756.
Total Outstanding Activity Conditions - 2
Date Name
07/09/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/08/2024 Arizona Department of Housing (ADOH) FBB Construction Approval – Provide documentation of ADOH building approval 1. Stamped plans or 2. Affixed sticker

Conditions

Permit Number - TC-FBB-0624-00123
Permit Status: Needs resubmittal
Permit Description: Temporary jobsite trailer that will be on-site for the duration construction at 7157 S Swan Rd, Tuscon, AZ 85756.
Date Description Comments
08/08/2024 Arizona Department of Housing (ADOH) Installation Approval - Provide documentation that the ADOH Installation inspection has been completed.