Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Demolition Permit
Apply Date:
11/05/2025
Applicant:
Andrea Carver
Description:
Backfill of existing pool (dimensions: 16’ × 26.5’) with clean fill dirt, compacted in lifts to prevent settling/dipping. • Install three drainage holes as requested to comply with permit and ensure proper future drainage. • Disconnect & cap utilities (water, gas, electric) serving the pool; remove and haul away all associated pool equipment.

Permit Reviews

Permit Number - TC-DMO-1125-00223
Permit Status: Inspections complete
Permit Description: Backfill of existing pool (dimensions: 16’ × 26.5’) with clean fill dirt, compacted in lifts to prevent settling/dipping. • Install three drainage holes as requested to comply with permit and ensure proper future drainage. • Disconnect & cap utilities (water, gas, electric) serving the pool; remove and haul away all associated pool equipment.
Start Date Submittal Complete Date Status  
11/10/2025 DEMOLITION v.1 11/12/2025 APPROVED Review Details

Conditions

Permit Number - TC-DMO-1125-00223
Permit Status: Inspections complete
Permit Description: Backfill of existing pool (dimensions: 16’ × 26.5’) with clean fill dirt, compacted in lifts to prevent settling/dipping. • Install three drainage holes as requested to comply with permit and ensure proper future drainage. • Disconnect & cap utilities (water, gas, electric) serving the pool; remove and haul away all associated pool equipment.
Date Description Comments
11/10/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-DMO-1125-00223
Permit Description: Backfill of existing pool (dimensions: 16’ × 26.5’) with clean fill dirt, compacted in lifts to prevent settling/dipping. • Install three drainage holes as requested to comply with permit and ensure proper future drainage. • Disconnect & cap utilities (water, gas, electric) serving the pool; remove and haul away all associated pool equipment.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/17/2025 PDSD Building Division - Demo - Progress Passed 11.17.2025
Approved per pool demo plan, verified 24"x24" drain holes - okay to proceed.
12/03/2025 PDSD Building Division - Demo - Final Passed 12.2.25
Approved