Permit: TC-DMO-0726-00124
Permit Details
Status:
Inspections Complete
Type:
Demolition Permit
Address:
3100 N CAMPBELL AV
Address NEW:
3100 N CAMPBELL AV
Apply Date:
07/20/2026
Applicant:
Ian Deering
Description:
Demolition of interior walls, ceilings, flooring and finishes to accommodate new building TI.
Permit Reviews
Permit Number - TC-DMO-0726-00124
Permit Status: Inspections complete
Permit Description: Demolition of interior walls, ceilings, flooring and finishes to accommodate new building TI.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2026 | ADMINISTRATIVE v.1 | 08/19/2026 | REQUIRES RESUBMIT |
| 08/21/2026 | ADMINISTRATIVE v.2 | 08/21/2026 | REQUIRES RESUBMIT |
| 07/22/2026 | DEMOLITION v.1 | 07/31/2026 | APPROVED |
Conditions
Permit Number - TC-DMO-0726-00124
Permit Status: Inspections complete
Permit Description: Demolition of interior walls, ceilings, flooring and finishes to accommodate new building TI.
| Date | Description | Comments |
|---|---|---|
| 07/22/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/22/2026 | The collection of The Notification Affidavit is required prior to issuance of permit. Please visit https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-development-services/documents/demolition_confirmation_statement2-14-14.pdf to download the form. Once the form has been filled out please upload to the Attachments tab on your portal. | |
| 07/24/2026 | Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, floodplain use permit TE-FPU-0626-00267 must have fees paid prior to issuance. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-DMO-0726-00124
Permit Description: Demolition of interior walls, ceilings, flooring and finishes to accommodate new building TI.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2026 | PDSD Building Division - Demo - Final | Passed |