Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1225-02336
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
3030 E SPEEDWAY BL
Address NEW:
3030 E SPEEDWAY BL
Apply Date:
12/29/2025
Applicant:
Erin Hastreiter
Description:
Building Repairs due to Car Crash
Permit Reviews
Permit Number - TC-COM-1225-02336
Permit Status: In review
Permit Description: Building Repairs due to Car Crash
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/31/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/31/2025 | REQUIRES RESUBMIT |
| 02/05/2026 | COMMERCIAL REVIEW - FULL v.3 | N/A | IN REVIEW |
| 01/13/2026 | COMMERCIAL REVIEW - FULL v.2 | 02/02/2026 | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-1225-02336
Permit Status: In review
Permit Description: Building Repairs due to Car Crash
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/31/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 12/31/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-1225-02336
Permit Description: Building Repairs due to Car Crash
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2026 | PDSD Building Division SIte Consultation | Passed | construction site has been assessed. means of egress is in place and has a separation from construction to the public space by an existing partition wall. the masonry work will be completed by the outside and all other construction will be done when business operations are closed. 1/30/2026 |