Permit Details

Status:
Expired
Type:
Commercial Building
Apply Date:
12/22/2025
Applicant:
Sarah Brausch
Description:
CONSTRUCTION OF A NEW 90,000 SF, THREE STORY SELF STORAGE FACILITY WITH A LOBBY AND RENTABLE CONDITIONED STORAGE UNITS.

Permit Reviews

Permit Number - TC-COM-1225-02303
Permit Status: Expired
Permit Description: CONSTRUCTION OF A NEW 90,000 SF, THREE STORY SELF STORAGE FACILITY WITH A LOBBY AND RENTABLE CONDITIONED STORAGE UNITS.
Start Date Submittal Complete Date Status  
12/23/2025 COMMERCIAL REVIEW - FULL v.1 01/21/2026 REQUIRES RESUBMIT Review Details
01/23/2026 COMMERCIAL REVIEW - FULL v.2 01/23/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1225-02303
Permit Status: Expired
Permit Description: CONSTRUCTION OF A NEW 90,000 SF, THREE STORY SELF STORAGE FACILITY WITH A LOBBY AND RENTABLE CONDITIONED STORAGE UNITS.
Total Outstanding Activity Conditions - 16
Date Name
01/20/2026 AIR BALANCING REPORT IS REQUIRED.
01/20/2026 SPECIAL INSPECTION OF COLD-FORMED STEEL LIGHT-FRAME CONSTRUCTION IS REQUIRED.
01/20/2026 SPECIAL IINSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
01/20/2026 SPECIAL INSPECTION OF E.I.F.S IS REQUIRED.
01/20/2026 Elevator Designs must be submitted and approved prior to installation
01/20/2026 SPECIAL INSPECTION OF FABRICATORS IS REQUIRED.
01/20/2026 SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
01/20/2026 SPECIAL INSPECTION OF SOILS IS REQUIRED.
01/20/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
01/20/2026 Stair Designs must be submitted and approved prior to installation
01/20/2026 SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED.
01/20/2026 Structural Steel (Drawings and Product Data) submitted and approved prior to installation
01/20/2026 WATER STERILIZATION REPORT IS REQUIRED.
01/21/2026 ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
12/23/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.