Permit Details

Status:
Complete
Type:
Commercial Building
Address:
5201 S 12TH AV
Address NEW:
5201 S 12TH AV
Apply Date:
12/19/2025
Applicant:
Kelly Rehm
Description:
The El Guero Canelo 12th Ave PV system will consist of 195 500W modules & 3 grid-tied inverters, mounted on 2 new steel parking canopies in the existing parking lots. The system will supply power through an existing TEP service.

Permit Reviews

Permit Number - TC-COM-1225-02294
Permit Status: Complete
Permit Description: The El Guero Canelo 12th Ave PV system will consist of 195 500W modules & 3 grid-tied inverters, mounted on 2 new steel parking canopies in the existing parking lots. The system will supply power through an existing TEP service.
Start Date Submittal Complete Date Status  
03/26/2026 SPECIAL INSPECTION REVIEW v.1 03/26/2026 REQUIRES RESUBMIT Review Details
02/10/2026 COMMERCIAL REVIEW - FULL v.3 02/25/2026 APPROVED Review Details
05/07/2026 SPECIAL INSPECTION REVIEW v.1 N/A APPROVED Review Details
12/19/2025 COMMERCIAL REVIEW - FULL v.1 01/14/2026 REQUIRES RESUBMIT Review Details
01/22/2026 COMMERCIAL REVIEW - FULL v.2 01/22/2026 REQUIRES RESUBMIT Review Details
03/26/2026 SPECIAL INSPECTION REVIEW v.2 04/01/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-1225-02294
Permit Status: Complete
Permit Description: The El Guero Canelo 12th Ave PV system will consist of 195 500W modules & 3 grid-tied inverters, mounted on 2 new steel parking canopies in the existing parking lots. The system will supply power through an existing TEP service.
Date Description Comments
01/12/2026 SPECIAL INSPECTION OF COLD-FORMED STEEL FRAMING IS REQUIRED.
12/19/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/12/2026 SPECIAL INSPECTION OF FABRICATORS IS REQUIRED
01/12/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
01/12/2026 SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1225-02294
Permite Description: The El Guero Canelo 12th Ave PV system will consist of 195 500W modules & 3 grid-tied inverters, mounted on 2 new steel parking canopies in the existing parking lots. The system will supply power through an existing TEP service.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/10/2026 COT - CSOL - Outdoor Lighting Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1225-02294
Permit Description: The El Guero Canelo 12th Ave PV system will consist of 195 500W modules & 3 grid-tied inverters, mounted on 2 new steel parking canopies in the existing parking lots. The system will supply power through an existing TEP service.
Total Completed Inspections - 10
Date Description Inspector Results Comments
03/04/2026 PDSD Building Division Pre-Construction Meeting Passed
03/04/2026 COT - LCBU - Excavation/Rebar/Zoning Passed 3-4-26: excavation/reinforcement on 9 pier footings verified per detail 101 and pier excavation schedule. Okay for concrete placement at progress areas.
03/24/2026 COT - CSOL - Electrical Underground Solar Project Passed 03/24/2026
Verified underground (3) 1.25" and (2) 1" schedule 40 conduit run of approximately 50'. Okay to backfill with shading materials.
04/10/2026 BULD - Electrical Clearance Passed 4/10/2026 clearance to TEP DGC.
04/10/2026 COT - CSOL - Electrical Final Solar Project Passed
04/10/2026 COT - CSOL - Electrical Intermediate Solar Project Passed
04/10/2026 COT - LCBU - Building Final Passed
04/10/2026 COT - LCBU - Framing Passed Approved per third party reports. 4/10/2026
04/10/2026 ENGR Engineering Final Passed
04/10/2026 TRSP - ROW - Final/Close-Out Passed