Permit: TC-COM-1225-02272
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4801 E BROADWAY BL UNIT 251
Address NEW:
4801 E BROADWAY BL UNIT 251
Apply Date:
12/15/2025
Applicant:
Adam Forchelli
Description:
Rev.1 3/25/2026 UNIT 251 - NEW TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL BUILDING. THE BUILDING IS TO REMAIN AS IS W/ NO ADDITIONAL SQUARE FOOTAGE ADDED. ALL EXISTING SITE CONDITIONS TO REMAIN AS IS. TENANT IMPROVEMENT WILL REQUIRE: ARCHITECTURAL , PLUMBING, MECHANICAL & ELECTRICAL WORK.
Permit Reviews
Permit Number - TC-COM-1225-02272
Permit Status: Complete
Permit Description: Rev.1 3/25/2026
UNIT 251 - NEW TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL
BUILDING. THE BUILDING IS TO REMAIN AS IS W/ NO ADDITIONAL
SQUARE FOOTAGE ADDED. ALL EXISTING SITE CONDITIONS TO
REMAIN AS IS. TENANT IMPROVEMENT WILL REQUIRE:
ARCHITECTURAL , PLUMBING, MECHANICAL & ELECTRICAL WORK.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/24/2026 | APPROVED |
| 02/26/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 02/26/2026 | REQUIRES RESUBMIT |
| 12/17/2025 | COMMERCIAL REVIEW - FULL v.1 | 01/13/2026 | APPROVED |
| 03/02/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 03/25/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1225-02272
Permit Status: Complete
Permit Description: Rev.1 3/25/2026
UNIT 251 - NEW TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL
BUILDING. THE BUILDING IS TO REMAIN AS IS W/ NO ADDITIONAL
SQUARE FOOTAGE ADDED. ALL EXISTING SITE CONDITIONS TO
REMAIN AS IS. TENANT IMPROVEMENT WILL REQUIRE:
ARCHITECTURAL , PLUMBING, MECHANICAL & ELECTRICAL WORK.
| Date | Description | Comments |
|---|---|---|
| 12/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/08/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1225-02272
Permite Description: Rev.1 3/25/2026
UNIT 251 - NEW TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL
BUILDING. THE BUILDING IS TO REMAIN AS IS W/ NO ADDITIONAL
SQUARE FOOTAGE ADDED. ALL EXISTING SITE CONDITIONS TO
REMAIN AS IS. TENANT IMPROVEMENT WILL REQUIRE:
ARCHITECTURAL , PLUMBING, MECHANICAL & ELECTRICAL WORK.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | COT - LCEL - Electrical Intermediate | N/A | Canceled | |
| 04/13/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 04/13/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1225-02272
Permit Description: Rev.1 3/25/2026
UNIT 251 - NEW TENANT IMPROVEMENT TO AN EXISTING COMMERCIAL
BUILDING. THE BUILDING IS TO REMAIN AS IS W/ NO ADDITIONAL
SQUARE FOOTAGE ADDED. ALL EXISTING SITE CONDITIONS TO
REMAIN AS IS. TENANT IMPROVEMENT WILL REQUIRE:
ARCHITECTURAL , PLUMBING, MECHANICAL & ELECTRICAL WORK.
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 02/05/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/24/2026 | COT - LCEL - Electrical Intermediate | Passed | In wall electric is complete. | |
| 02/24/2026 | COT - LCBU - Framing | Passed | Ok to insulate and sheet rock. | |
| 02/24/2026 | COT - LCEL - Electrical Above Ceiling | Passed | Ok to set ceiling tiles throughout. | |
| 02/24/2026 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 04/07/2026 | COT - LCME - Mechanical Final | Passed | ||
| 04/13/2026 | COT - FCON - Alarm - Final | Passed | ||
| 04/13/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/13/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 04/14/2026 | COT - LCBU - Building Final | Passed | 4/14/26 Pass |
|
| 04/14/2026 | COT - LCEL - Electrical Final | Passed | 4/14/26 Pass |
|
| 04/14/2026 | COT - LCPL - Plumbing Final | Passed | 4/14/26 Pass |