Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
12/11/2025
Applicant:
David Barnhart
Description:
Gas meter reconnect

Permit Reviews

Permit Number - TC-COM-1225-02239
Permit Status: Inspections
Permit Description: Gas meter reconnect
Start Date Submittal Complete Date Status  
12/11/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 12/15/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1225-02239
Permit Status: Inspections
Permit Description: Gas meter reconnect
Date Description Comments
12/15/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1225-02239
Permite Description: Gas meter reconnect
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/26/2025 COT - LCPL - Plumbing Final N/A Re-inspection required 12-26-25: contractor not at south parking lot as indicated on notes. Waited there approximately 20 minutes before leaving. Reschedule at your convenience.
12/26/2025 COT - BULD - SWG Clearance N/A Re-inspection required 12-26-25: contractor not at south parking lot as indicated on notes. Waited there approximately 20 minutes before leaving. Reschedule at your convenience.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1225-02239
Permit Description: Gas meter reconnect
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/22/2025 COT - LCPL - Gas Pressure Test Passed 12.22.25
Pressure verified under test
Approved
12/30/2025 COT - LCPL - Plumbing Final Passed
12/30/2025 COT - BULD - SWG Clearance Passed 12.30.25
Approved for SWG clearance