Permit: TC-COM-1225-02216
Permit Details
Apply Date:
12/09/2025
Applicant:
Maria Smith
Description:
12 x 12 Steel Ramada without electrical
Permit Reviews
Permit Number - TC-COM-1225-02216
Permit Status: Complete
Permit Description: 12 x 12 Steel Ramada without electrical
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/11/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 01/05/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1225-02216
Permit Status: Complete
Permit Description: 12 x 12 Steel Ramada without electrical
| Date | Description | Comments |
|---|---|---|
| 12/11/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/11/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1225-02216
Permit Description: 12 x 12 Steel Ramada without electrical
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Total of 4 column footers. All per plan. Okay for concrete placement. 2/25/2026 | |
| 03/20/2026 | COT - LCBU - Framing | Passed | ||
| 04/10/2026 | COT - LCBU - Building Final | Passed | 04/10/2026 Approved per steel ramada plan. |
|
| 04/10/2026 | ENGR Engineering Final | Passed | ||
| 04/10/2026 | TRSP - ROW - Final/Close-Out | Passed |