Permit: TC-COM-1225-02203
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4932 E SPEEDWAY BL
Address NEW:
4932 E SPEEDWAY BL
Apply Date:
12/08/2025
Applicant:
Cascade Electric
Description:
Replace BAD 124TB 200 Amp Milbank Meter Box
Permit Reviews
Permit Number - TC-COM-1225-02203
Permit Status: Complete
Permit Description: Replace BAD 124TB 200 Amp Milbank Meter Box
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/08/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 12/08/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1225-02203
Permit Status: Complete
Permit Description: Replace BAD 124TB 200 Amp Milbank Meter Box
| Date | Description | Comments |
|---|---|---|
| 12/10/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1225-02203
Permit Description: Replace BAD 124TB 200 Amp Milbank Meter Box
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | COT - LCEL - Electrical Final | Passed | 4932 e speedway, ready for reconnection, wrong address was originally Given, Clearance RECN Called TEP 10:35 | |
| 01/21/2026 | BULD - Electrical Clearance | Passed | 4932 e speedway, ready for reconnection, wrong address was originally Given, Clearance RECN Called TEP 10:35 |