Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
248 N MELWOOD AV
Address NEW:
248 N MELWOOD AV
Apply Date:
12/27/2024
Applicant:
Chandler Macomber
Description:
Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.

Permit Reviews

Permit Number - TC-COM-1224-02399
Permit Status: Inspections
Permit Description: Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
Start Date Submittal Complete Date Status  
12/30/2024 COMMERCIAL PDSD SIMPLE REVIEW v.1 01/02/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1224-02399
Permit Status: Inspections
Permit Description: Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
Date Description Comments
12/30/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1224-02399
Permit Description: Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/30/2025 COT - BULD - SWG Clearance Passed 7.30.25
PVC is painted and terminates correctly off of roof. Fuses at disconnects verified. UL listed equipment verified. Air admittance verified at interior units. Proper slope on lines verified. Sediment traps verified. Shut off valves verified. Mechanical equipment verified and observed to be in working condition.
07/30/2025 BULD - Electrical Clearance Passed 7.30.25
PVC is painted and terminates correctly off of roof. Fuses at disconnects verified. UL listed equipment verified. Air admittance verified at interior units. Proper slope on lines verified. Sediment traps verified. Shut off valves verified. Mechanical equipment verified and observed to be in working condition.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
GLXS4BA2410 SPECS_V1.PDF DOCUMENTS VIEW
J LOADS 248-262 N MELWOOD AVE_V1.PDF DOCUMENTS VIEW