Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/23/2024
Applicant:
Description:
New Restaurant in vacant TI space within building 3 (north building) at the Benedictine apartments.2750

Permit Reviews

Permit Number - TC-COM-1224-02395
Permit Status: Complete
Permit Description: New Restaurant in vacant TI space within building 3 (north building) at the Benedictine apartments.2750
Start Date Submittal Complete Date Status  
03/24/2025 COMMERCIAL REVIEW - FULL v.3 04/14/2025 REQUIRES RESUBMIT Review Details
01/07/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/08/2026 REQUIRES RESUBMIT Review Details
01/08/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/13/2026 APPROVED Review Details
12/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/30/2025 APPROVED Review Details
12/31/2024 COMMERCIAL REVIEW - FULL v.1 02/19/2025 REQUIRES RESUBMIT Review Details
02/25/2025 COMMERCIAL REVIEW - FULL v.2 03/20/2025 REQUIRES RESUBMIT Review Details
12/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/22/2025 APPROVED Review Details
04/24/2025 RESTAMP - COMMERCIAL v.1 04/29/2025 APPROVED Review Details
04/15/2025 COMMERCIAL REVIEW - FULL v.4 04/24/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1224-02395
Permit Status: Complete
Permit Description: New Restaurant in vacant TI space within building 3 (north building) at the Benedictine apartments.2750
Date Description Comments
12/31/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
01/22/2025 AIR BALANCING REPORT, INCLUDING KITCHEN HOOD PERFORMANCE, IS REQUIRED.
03/11/2025 Submit the Special Inspection field report for the concrete stem wall and footing prior to Final Inspection.
01/22/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
03/11/2025 Prior to Final Inspection, Exterior insulation and finish systems (EIFS) Special inspection Field Report shall be submitted. A water-resistive barrier coating complying with ASTM E2570 requires special inspection of the water-resistive barrier coating where installed over a sheathing substrate. IBC 1705.16.1
03/11/2025 Separate submittal to PC Industrial Wastewater Control is required for new or re-purposed interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
01/22/2025 SPECIAL INSPECTION FOR POST INSTALLED BOLTS (EXPANSION OR EPOXY TYPE) IS REQUIRED.
01/22/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING (FIELD & SHOP) IS REQUIRED.
01/22/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1224-02395
Permite Description: New Restaurant in vacant TI space within building 3 (north building) at the Benedictine apartments.2750
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/02/2025 COT - LCPL - Sewer N/A Partial Pass Partial pass. Underground for both water closets and lav tied into sewer approved. 6/2/2025
12/12/2025 COT - LCEL - Electrical Final N/A Not Ready
12/12/2025 COT - LCEL - Electrical Above Ceiling N/A Not Ready
12/17/2025 COT - FCON - Fire - Final N/A Partial Pass EM lights /exit signs on patio. Hardware on south patio exit. POA permit. Approved to obtain TCO level 2

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1224-02395
Permit Description: New Restaurant in vacant TI space within building 3 (north building) at the Benedictine apartments.2750
Total Completed Inspections - 26
Date Description Inspector Results Comments
06/17/2025 COT - LCPL - Sewer Passed Interior waste and vent lines and grease lines (underground). Ok to cover progress areas.
07/24/2025 COT - LCBU - Preslab Passed Walk-in cooler area. Ok to place concrete in progress area.
10/23/2025 COT - LCBU - Framing Passed Ok to insulate and cover interior walls.
10/23/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
10/23/2025 COT - LCPL - Plumbing Intermediate Passed
10/23/2025 COT - LCEL - Electrical Intermediate Passed In wall electric complete
10/23/2025 COT - LCME - Mechanical Final Passed
11/19/2025 COT - BULD - SWG Clearance Passed No gas required. This inspection is for plumbing above ceiling.
11/19/2025 COT - LCBU - Masonry Pregrout Passed
11/19/2025 COT - LCBU - Roof Nailing Passed
11/19/2025 COT - LCBU - Stem Wall/Retaining Wall Passed
11/19/2025 COT - LCME - Mechanical Intermediate Passed
11/19/2025 COT - LCEL - Grounding/Bonding Passed
11/18/2025 TRSP - ROW - Final/Close-Out Passed
12/12/2025 COT - FCON - Sprinkler - Final Passed
12/12/2025 COT - LCPL - Plumbing Final Passed
12/12/2025 COT - LCPL - Plumbing Progress Passed
12/12/2025 COT - LCPL - Rough Soil Passed
12/17/2025 COT - LCEL - Electrical Final Passed
12/17/2025 ENGR Engineering Final Passed
12/17/2025 COT - LCEL - Electrical Above Ceiling Passed
12/17/2025 COT - LCBU - Building Final Passed OK to make application for Certificate of Occupancy.
12/17/2025 BULD - Electrical Clearance Passed No electric clearance required.
12/17/2025 COT - LCME - Kitchen Hood Passed No cooking hood present; pizza oven exhaust only.
12/17/2025 COT - FCON - Alarm - Final Passed
12/19/2025 COT - FCON - Fire - Final Passed