Permit: TC-COM-1224-02383
Permit Details
Apply Date:
12/20/2024
Applicant:
Kelly Rehm
Description:
The Beyond Bread Park Avenue PV system will consist of 403 modules mounted on 4 new steel structures and an existing roof. Grid-tied inverters will supply power through a single TEP service.
Permit Reviews
Permit Number - TC-COM-1224-02383
Permit Status: Complete
Permit Description: The Beyond Bread Park Avenue PV system will consist of 403 modules mounted on 4 new steel structures and an existing roof. Grid-tied inverters will supply power through a single TEP service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 01/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
| 12/23/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/17/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1224-02383
Permit Status: Complete
Permit Description: The Beyond Bread Park Avenue PV system will consist of 403 modules mounted on 4 new steel structures and an existing roof. Grid-tied inverters will supply power through a single TEP service.
| Date | Description | Comments |
|---|---|---|
| 01/10/2025 | SPECIAL INSPECTION FOR COLD-FORMED STEEL FRAMING IS REQUIRED. | |
| 01/10/2025 | SPECIAL INSPECTION FOR FABRICATORS IS REQUIRED. | |
| 01/10/2025 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02383
Permite Description: The Beyond Bread Park Avenue PV system will consist of 403 modules mounted on 4 new steel structures and an existing roof. Grid-tied inverters will supply power through a single TEP service.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2025 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02383
Permit Description: The Beyond Bread Park Avenue PV system will consist of 403 modules mounted on 4 new steel structures and an existing roof. Grid-tied inverters will supply power through a single TEP service.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Steel columns (15) with #6 rebar at 9 - 15 feet deep in parking area; 4 steel columns with spread footings at 6 feet deep in loading dock area. OK to place concrete in progress areas. | |
| 02/10/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | Grounding in caisson columns,in parking lot,area. | |
| 02/13/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | Conduits for solar array system at 1’, 1 1/2”, 2” for underground electric. Ok to cover progress areas. | |
| 04/04/2025 | COT - CSOL - Electrical Final Solar Project | Passed | Approved solar structures - DGC Clearance to TEP is required for the solar meter | |
| 04/04/2025 | COT - LCBU - Building Final | Passed | ||
| 04/04/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/04/2025 | ENGR Engineering Final | Passed | ||
| 04/03/2025 | TRSP - ROW - Notice of Completion | Passed | ||
| 04/04/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 04/04/2025 | COT - LCBU - Framing | Passed | ||
| 04/04/2025 | COT - CSOL - Outdoor Lighting Solar Project | Passed | ||
| 04/04/2025 | BULD - Electrical Clearance | Passed | Approved solar structures - DGC Clearance to TEP is required for the solar meter |