Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
12/06/2024
Applicant:
Stephen Jobe
Description:
Scope of work to replace gas line on property starting from meter throughout home as follows: -disconnect and remove all existing black iron piping from areas where it is accessible -Install new three-quarter inch 90 coming off of meter install three-quarter inch lead with 15 pound pressure gauge for future testing -run three-quarter inch piping up wall and through roofline mounting piping to wall per code with struts -install three-quarter inch roof jack with code approved roofing cement or tar -Run new three-quarter inch gas line along roof line, tee off to service water heater and continue to furnace location to tie into system. -Drop down air vent in utility closet to service water heater and reduce to half inch. Install new quarter turn gas valve with drip leg and new flex line to reconnect to water heater. -install new quarter gas valve with flex line at heater unit on roof -all piping on roof will be mounted Utilizing red block and straps. -upon completion of install, we will perform a 15 pound gas pressure test for 30 minutes to ensure proper hold of pressure

Permit Reviews

Permit Number - TC-COM-1224-02306
Permit Status: Inspections complete
Permit Description: Scope of work to replace gas line on property starting from meter throughout home as follows: -disconnect and remove all existing black iron piping from areas where it is accessible -Install new three-quarter inch 90 coming off of meter install three-quarter inch lead with 15 pound pressure gauge for future testing -run three-quarter inch piping up wall and through roofline mounting piping to wall per code with struts -install three-quarter inch roof jack with code approved roofing cement or tar -Run new three-quarter inch gas line along roof line, tee off to service water heater and continue to furnace location to tie into system. -Drop down air vent in utility closet to service water heater and reduce to half inch. Install new quarter turn gas valve with drip leg and new flex line to reconnect to water heater. -install new quarter gas valve with flex line at heater unit on roof -all piping on roof will be mounted Utilizing red block and straps. -upon completion of install, we will perform a 15 pound gas pressure test for 30 minutes to ensure proper hold of pressure
Start Date Submittal Complete Date Status  
12/13/2024 COMMERCIAL REVIEW - LIMITED v.1 12/31/2024 APPROVED Review Details

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1224-02306
Permit Description: Scope of work to replace gas line on property starting from meter throughout home as follows: -disconnect and remove all existing black iron piping from areas where it is accessible -Install new three-quarter inch 90 coming off of meter install three-quarter inch lead with 15 pound pressure gauge for future testing -run three-quarter inch piping up wall and through roofline mounting piping to wall per code with struts -install three-quarter inch roof jack with code approved roofing cement or tar -Run new three-quarter inch gas line along roof line, tee off to service water heater and continue to furnace location to tie into system. -Drop down air vent in utility closet to service water heater and reduce to half inch. Install new quarter turn gas valve with drip leg and new flex line to reconnect to water heater. -install new quarter gas valve with flex line at heater unit on roof -all piping on roof will be mounted Utilizing red block and straps. -upon completion of install, we will perform a 15 pound gas pressure test for 30 minutes to ensure proper hold of pressure
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/16/2025 COT - LCPL - Gas Pressure Test Passed
01/16/2025 COT - LCBU - Building Final Passed
01/16/2025 COT - LCPL - Gas Final Passed
01/16/2025 COT - BULD - SWG Clearance Passed Approved gas piping and pressure test - SWG Clearance is required for unit #1

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1401 E. ADELAIDE 1_V1.PDF DOCUMENTS VIEW