Permit: TC-COM-1224-02306
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
1401 E ADELAIDE DR BLDG 0 UNIT 1
Address NEW:
1401 E ADELAIDE DR BLDG 0 UNIT 1
Apply Date:
12/06/2024
Applicant:
Stephen Jobe
Description:
Scope of work to replace gas line on property starting from meter throughout home as follows: -disconnect and remove all existing black iron piping from areas where it is accessible -Install new three-quarter inch 90 coming off of meter install three-quarter inch lead with 15 pound pressure gauge for future testing -run three-quarter inch piping up wall and through roofline mounting piping to wall per code with struts -install three-quarter inch roof jack with code approved roofing cement or tar -Run new three-quarter inch gas line along roof line, tee off to service water heater and continue to furnace location to tie into system. -Drop down air vent in utility closet to service water heater and reduce to half inch. Install new quarter turn gas valve with drip leg and new flex line to reconnect to water heater. -install new quarter gas valve with flex line at heater unit on roof -all piping on roof will be mounted Utilizing red block and straps. -upon completion of install, we will perform a 15 pound gas pressure test for 30 minutes to ensure proper hold of pressure
Permit Reviews
Permit Number - TC-COM-1224-02306
Permit Status: Inspections complete
Permit Description: Scope of work to replace gas line on property starting from meter throughout home as follows:
-disconnect and remove all existing black iron piping from areas where it is accessible
-Install new three-quarter inch 90 coming off of meter install three-quarter inch lead with 15 pound pressure gauge for future testing
-run three-quarter inch piping up wall and through roofline mounting piping to wall per code with struts
-install three-quarter inch roof jack with code approved roofing cement or tar
-Run new three-quarter inch gas line along roof line, tee off to service water heater and continue to furnace location to tie into system.
-Drop down air vent in utility closet to service water heater and reduce to half inch. Install new quarter turn gas valve with drip leg and new flex line to reconnect to water heater.
-install new quarter gas valve with flex line at heater unit on roof
-all piping on roof will be mounted Utilizing red block and straps.
-upon completion of install, we will perform a 15 pound gas pressure test for 30 minutes to ensure proper hold of pressure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/13/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 12/31/2024 | APPROVED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1224-02306
Permit Description: Scope of work to replace gas line on property starting from meter throughout home as follows:
-disconnect and remove all existing black iron piping from areas where it is accessible
-Install new three-quarter inch 90 coming off of meter install three-quarter inch lead with 15 pound pressure gauge for future testing
-run three-quarter inch piping up wall and through roofline mounting piping to wall per code with struts
-install three-quarter inch roof jack with code approved roofing cement or tar
-Run new three-quarter inch gas line along roof line, tee off to service water heater and continue to furnace location to tie into system.
-Drop down air vent in utility closet to service water heater and reduce to half inch. Install new quarter turn gas valve with drip leg and new flex line to reconnect to water heater.
-install new quarter gas valve with flex line at heater unit on roof
-all piping on roof will be mounted Utilizing red block and straps.
-upon completion of install, we will perform a 15 pound gas pressure test for 30 minutes to ensure proper hold of pressure
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | COT - LCPL - Gas Pressure Test | Passed | ||
| 01/16/2025 | COT - LCBU - Building Final | Passed | ||
| 01/16/2025 | COT - LCPL - Gas Final | Passed | ||
| 01/16/2025 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test - SWG Clearance is required for unit #1 |