Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/22/2023
Applicant:
Kelly Rehm
Description:
The Coyote Task Force PV system will consist of 57 500W modules. A grid-tied inverter will supply power through existing TEP service (Meter # 151514062). All modules will be roof-mounted.

Permit Reviews

Permit Number - TC-COM-1223-02912
Permit Status: Complete
Permit Description: The Coyote Task Force PV system will consist of 57 500W modules. A grid-tied inverter will supply power through existing TEP service (Meter # 151514062). All modules will be roof-mounted.
Start Date Submittal Complete Date Status  
02/01/2024 RESTAMP - COMMERCIAL v.1 02/05/2024 APPROVED Review Details
12/26/2023 COMMERCIAL REVIEW - FULL v.1 01/24/2024 REQUIRES RESUBMIT Review Details
01/24/2024 COMMERCIAL REVIEW - FULL v.2 02/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1223-02912
Permit Status: Complete
Permit Description: The Coyote Task Force PV system will consist of 57 500W modules. A grid-tied inverter will supply power through existing TEP service (Meter # 151514062). All modules will be roof-mounted.
Date Description Comments
01/12/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1223-02912
Permite Description: The Coyote Task Force PV system will consist of 57 500W modules. A grid-tied inverter will supply power through existing TEP service (Meter # 151514062). All modules will be roof-mounted.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/16/2024 COT - CSOL - Electrical Progress Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1223-02912
Permit Description: The Coyote Task Force PV system will consist of 57 500W modules. A grid-tied inverter will supply power through existing TEP service (Meter # 151514062). All modules will be roof-mounted.
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/09/2024 BULD - Electrical Clearance Passed 4/9/24: DGC verbal clearance to TEP at 12:18am.
04/16/2024 COT - CSOL - Electrical Final Solar Project Passed
04/16/2024 COT - LCBU - Building Final Passed
04/16/2024 ENGR Engineering Final Passed
04/16/2024 COT - CSOL - Grounding/Bonding Solar Project Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-COYOTE TASK FORCE PV 28.5KW RFC_V2.PDF DOCUMENTS VIEW