Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/05/2023
Applicant:
Erin Hastreiter
Description:
Commercial TI for office space

Permit Reviews

Permit Number - TC-COM-1223-02784
Permit Status: Complete
Permit Description: Commercial TI for office space
Start Date Submittal Complete Date Status  
05/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/16/2024 APPROVED Review Details
12/07/2023 COMMERCIAL REVIEW - FULL v.1 01/18/2024 APPROVED Review Details
05/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/30/2024 APPROVED Review Details
01/18/2024 RESTAMP - COMMERCIAL v.1 01/22/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1223-02784
Permit Status: Complete
Permit Description: Commercial TI for office space
Date Description Comments
01/17/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
12/07/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/17/2024 WATER STERILIZATION REPORT IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1223-02784
Permit Description: Commercial TI for office space
Total Completed Inspections - 15
Date Description Inspector Results Comments
02/09/2024 COT - HCBU - Framing Passed Framing, Plumbing, Mechanical and electrical rough-in is complete. Okay to install drywall on both sides of new framed walls.
02/09/2024 COT - HCEL - Electrical Intermediate Passed Framing, Plumbing, Mechanical and electrical rough-in is complete. Okay to install drywall on both sides of new framed walls.
02/09/2024 COT - HCPL - Plumbing Intermediate Passed Framing, Plumbing, Mechanical and electrical rough-in is complete. Okay to install drywall on both sides of new framed walls.
04/10/2024 COT - HCEL - Electrical Above Ceiling Passed Electrical above ceiling is complete, all j-boxes are properly labeled. Okay to proceed with ceiling tile installation.
04/10/2024 COT - HCME - Mechanical Above Ceiling Passed Mechanical above ceiling is complete, all supply registers, return air registers, and ductwork is properly installed. Okay to proceed with ceiling tile installation.
04/10/2024 COT - HCPL - Plumbing Above Ceiling Passed Plumbing above ceiling is complete, all supply water lines are properly installed and supported, DWV pipes are complete and supported. Okay to proceed with ceiling tile installation.
05/09/2024 COT - FCON - Fire - Final Passed
05/09/2024 COT - FCON - Sprinkler - Final Passed
05/09/2024 TRSP - ROW - Final/Close-Out Passed
05/09/2024 ENGR Engineering Final Passed
05/10/2024 COT - HCBU - Building Final Passed Ok to make application for Certificate of Occupancy.
05/10/2024 COT - HCEL - Electrical Final Passed
05/10/2024 COT - HCME - Mechanical Final Passed
05/10/2024 COT - HCPL - Plumbing Final Passed
05/24/2024 COT - HCME - Mechanical Intermediate Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
24E0360_1 TURNERRES 05 17 2024 1051-2024-05-24_V1.PDF DOCUMENTS VIEW
REGUS T.I. AT NEW WORLD PLAZA - REPORT 4-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS (1)_V1.PDF DOCUMENTS VIEW
STANTEC-PSA_V1.PDF DOCUMENTS VIEW