Permit: TC-COM-1222-00360
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6400 E EL DORADO CI UNIT C140
Address NEW:
6400 E EL DORADO CI UNIT C140
Apply Date:
12/23/2022
Applicant:
dennis cozzetti
Description:
A library remodel to bar.
Permit Reviews
Permit Number - TC-COM-1222-00360
Permit Status: Complete
Permit Description: A library remodel to bar.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/03/2023 | RESTAMP - COMMERCIAL v.1 | 05/04/2023 | APPROVED |
| 04/05/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/03/2023 | APPROVED |
| 03/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/16/2026 | APPROVED |
| 02/04/2023 | COMMERCIAL REVIEW - FULL v.1 | 02/17/2023 | REQUIRES RESUBMIT |
| 01/30/2025 | RESTAMP - COMMERCIAL v.1 | 01/31/2025 | APPROVED |
| 02/27/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/03/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1222-00360
Permit Status: Complete
Permit Description: A library remodel to bar.
| Date | Description | Comments |
|---|---|---|
| 02/04/2023 | Address has Multiple suites. Please sign into TDC online and submit a letter (with the suite#) explaining this is a restamp to satisfy the addressing condition. | |
| 02/06/2025 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 02/08/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 05/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 02/06/2025 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 02/08/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1222-00360
Permit Description: A library remodel to bar.
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 04/17/2025 | COT - HCPL - Rough Soil | Passed | ||
| 04/22/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 04/30/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/30/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 09/29/2025 | COT - LCBU - Framing | Passed | ||
| 09/29/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 09/29/2025 | COT - LCBU - Preslab | Passed | ||
| 10/01/2025 | BULD - Electrical Clearance | Passed | ECO TEP |
|
| 03/03/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 03/03/2026 | COT - HCPL - Plumbing Final | Passed | Passed 3/3/26 | |
| 03/03/2026 | COT - LCME - Mechanical Final | Passed | Passed 3/3/26 | |
| 03/03/2026 | COT - LCEL - Electrical Final | Passed | Passed 3/3/26 | |
| 03/03/2026 | COT - FCON - Fire - Final | Passed | ||
| 03/03/2026 | COT - LCBU - Building Final | Passed | Passed 3/3/26 |