Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/14/2022
Applicant:
alex enoch
Description:
Installed New Mini Splits. Also need electrical reconnect inspection. Power has been off for more than 6 months. TEP req. Units ABCD. Urgent: Loan is near default and can't refinance to permanent financing until leases are signed which needs permits filed. Valuation? What is this? The cost of the mini splits? Or the building value?

Permit Reviews

Permit Number - TC-COM-1222-00299
Permit Status: Complete
Permit Description: Installed New Mini Splits. Also need electrical reconnect inspection. Power has been off for more than 6 months. TEP req. Units ABCD. Urgent: Loan is near default and can't refinance to permanent financing until leases are signed which needs permits filed. Valuation? What is this? The cost of the mini splits? Or the building value?
Start Date Submittal Complete Date Status  
01/12/2023 COMMERCIAL PDSD SIMPLE REVIEW v.2 01/17/2023 APPROVED Review Details
12/15/2022 COMMERCIAL PDSD SIMPLE REVIEW v.1 01/11/2023 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1222-00299
Permit Description: Installed New Mini Splits. Also need electrical reconnect inspection. Power has been off for more than 6 months. TEP req. Units ABCD. Urgent: Loan is near default and can't refinance to permanent financing until leases are signed which needs permits filed. Valuation? What is this? The cost of the mini splits? Or the building value?
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/23/2023 COT - LCEL - Electrical Intermediate Passed all electrical outlets are installed.
01/23/2023 COT - LCEL - Electrical Above Ceiling Passed
01/23/2023 COT - LCME - Mechanical Final Passed all mini splits are installed
01/23/2023 COT - LCEL - Electrical Final Passed all electrical panels for units A through D are complete
01/23/2023 COT - LCME - Mechanical Intermediate Passed split units are installed in units A through D.
01/23/2023 COT - BULD - SWG Clearance Passed
01/23/2023 BULD - Electrical Clearance Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS SUB2_V2.PDF DOCUMENTS VIEW
JONES APARTMENTS MANUEL J UNITS A-D, G,H,J_V1.PDF DOCUMENTS VIEW
JONES GREE LIVO-GEN3-SUBMITTAL-18MBH-230V-A_V1.PDF DOCUMENTS VIEW