Permit: TC-COM-1222-00299
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3438 E MONTE VISTA DR BLDG 0 UNIT A
Address NEW:
3438 E MONTE VISTA DR BLDG 0 UNIT A
Apply Date:
12/14/2022
Applicant:
alex enoch
Description:
Installed New Mini Splits. Also need electrical reconnect inspection. Power has been off for more than 6 months. TEP req. Units ABCD. Urgent: Loan is near default and can't refinance to permanent financing until leases are signed which needs permits filed. Valuation? What is this? The cost of the mini splits? Or the building value?
Permit Reviews
Permit Number - TC-COM-1222-00299
Permit Status: Complete
Permit Description: Installed New Mini Splits.
Also need electrical reconnect inspection. Power has been off for more than 6 months. TEP req. Units ABCD.
Urgent: Loan is near default and can't refinance to permanent financing until leases are signed which needs permits filed.
Valuation? What is this? The cost of the mini splits? Or the building value?
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 01/17/2023 | APPROVED |
| 12/15/2022 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/11/2023 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1222-00299
Permit Description: Installed New Mini Splits.
Also need electrical reconnect inspection. Power has been off for more than 6 months. TEP req. Units ABCD.
Urgent: Loan is near default and can't refinance to permanent financing until leases are signed which needs permits filed.
Valuation? What is this? The cost of the mini splits? Or the building value?
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2023 | COT - LCEL - Electrical Intermediate | Passed | all electrical outlets are installed. | |
| 01/23/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 01/23/2023 | COT - LCME - Mechanical Final | Passed | all mini splits are installed | |
| 01/23/2023 | COT - LCEL - Electrical Final | Passed | all electrical panels for units A through D are complete | |
| 01/23/2023 | COT - LCME - Mechanical Intermediate | Passed | split units are installed in units A through D. | |
| 01/23/2023 | COT - BULD - SWG Clearance | Passed | ||
| 01/23/2023 | BULD - Electrical Clearance | Passed |