Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/14/2022
Applicant:
Carlos De Alva
Description:
Amendment to an existing permit T22BU00177

Permit Reviews

Permit Number - TC-COM-1222-00288
Permit Status: Complete
Permit Description: Amendment to an existing permit T22BU00177
Start Date Submittal Complete Date Status  
04/18/2023 RESTAMP - COMMERCIAL v.1 04/24/2023 APPROVED Review Details
03/17/2023 COMMERCIAL REVIEW - FULL v.2 04/18/2023 APPROVED Review Details
12/30/2022 COMMERCIAL REVIEW - FULL v.1 03/01/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1222-00288
Permit Status: Complete
Permit Description: Amendment to an existing permit T22BU00177
Date Description Comments
01/31/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
02/21/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/18/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
02/21/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/21/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
02/21/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/21/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1222-00288
Permit Description: Amendment to an existing permit T22BU00177
Total Completed Inspections - 12
Date Description Inspector Results Comments
10/12/2023 COT - LCBU - Building Final Passed Inspection completed on permit number T22CM05031
10/12/2023 COT - LCEL - Electrical Intermediate Passed Inspection completed on permit number T22CM05031
10/12/2023 COT - LCME - Mechanical Final Passed Inspection completed on permit number T22CM05031
10/12/2023 TRSP - ROW - Final/Close-Out Passed
10/12/2023 COT - LCEL - Electrical Final Passed Inspection completed on permit number T22CM05031
10/12/2023 ENGR Engineering Final Passed
10/12/2023 COT - FCON - Fire - Final Passed
10/12/2023 COT - LCEL - Electrical Above Ceiling Passed Inspection completed on permit number T22CM05031
10/12/2023 COT - HCPL - Gas Pressure Test Passed Inspection completed on permit number T22CM05031
10/12/2023 COT - BULD - SWG Clearance Passed Inspection completed on permit number T22CM05031
10/12/2023 BULD - Electrical Clearance Passed Inspection completed on permit number T22CM05031
10/12/2023 COT - LCPL - Plumbing Final Passed Inspection completed on permit number T22CM05031

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISION-3 LETTER_V1.PDF DOCUMENTS VIEW
CONS-COT SERVICE CENTER T.I. REV-5_V2.PDF DOCUMENTS VIEW
COT REVIEW RESPONSE LETTER 022323_V1.PDF DOCUMENTS VIEW
HEATING AND COOLING LOAD CALCULATIONS_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS - COT SERVICE CENTER BLDG 6_V1.PDF DOCUMENTS VIEW