Permit: TC-COM-1125-02156
Permit Details
Apply Date:
11/26/2025
Applicant:
Mike Culbert
Description:
CIP-1124-00036 was approved. To rehab a 51 unit motel converting them into kitchenettes. Site to have upgrades in electrical, mechanical, and plumbing. Link to TD-DEV-1125-00294 & TC-COM-1125-02156 & SD-0125-0006 & TP-PRE-1224-00273
Permit Reviews
Permit Number - TC-COM-1125-02156
Permit Status: In revision
Permit Description: CIP-1124-00036 was approved.
To rehab a 51 unit motel converting them into kitchenettes. Site to have upgrades in electrical, mechanical, and plumbing.
Link to TD-DEV-1125-00294 & TC-COM-1125-02156 & SD-0125-0006 & TP-PRE-1224-00273
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/26/2025 | HAST - COMMERCIAL NEW ADD/ALT FAST TRACK v.1 | 12/01/2025 | REQUIRES RESUBMIT |
| 08/05/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 06/09/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/24/2026 | APPROVED |
| 12/03/2025 | HAST - COMMERCIAL NEW ADD/ALT FAST TRACK v.2 | 12/08/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1125-02156
Permit Status: In revision
Permit Description: CIP-1124-00036 was approved.
To rehab a 51 unit motel converting them into kitchenettes. Site to have upgrades in electrical, mechanical, and plumbing.
Link to TD-DEV-1125-00294 & TC-COM-1125-02156 & SD-0125-0006 & TP-PRE-1224-00273
| Date | Description | Comments |
|---|---|---|
| 11/28/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 11/28/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/28/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/28/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 11/28/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 11/28/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 11/28/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 11/26/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/28/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-1125-02156
Permite Description: CIP-1124-00036 was approved.
To rehab a 51 unit motel converting them into kitchenettes. Site to have upgrades in electrical, mechanical, and plumbing.
Link to TD-DEV-1125-00294 & TC-COM-1125-02156 & SD-0125-0006 & TP-PRE-1224-00273
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2026 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 04/24/2026 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 06/08/2026 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | Fire caulking in place at new condensation line. Verified 1st and 2nd floors north wing up to center unit of the east wing. 6/8/2026 |
| 06/09/2026 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | Fire caulking in place at new condensation line. Verified 1st and 2nd floors south wing up to center remaining units of the east wing. 6/9/2026 |
| 06/09/2026 | COT - HCBU - Framing | N/A | Partial Pass | Partial pass. Verified new J/K studs along with new headers along with infilled openings. 1st and 2nd floors south wing up to the center remaining rooms of the east wing approved. 6/9/2026 |
| 06/23/2026 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 07/15/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | |
| 07/27/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Not Ready |