Permit: TC-COM-1125-02006
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
1009 N VIA TERRADO
Address NEW:
1009 N VIA TERRADO
Apply Date:
11/03/2025
Applicant:
David Hernandez
Description:
Run new gas line from meter going underground 12ft using polyethylene pipe, going up along side home approx 10ft, running approx 15ft branching off 8ft to feed furnace and 8ft down to service waterheater. Approx 55 ft in total length
Permit Reviews
Permit Number - TC-COM-1125-02006
Permit Status: Inspections
Permit Description: Run new gas line from meter going underground 12ft using polyethylene pipe, going up along side home approx 10ft, running approx 15ft branching off 8ft to feed furnace and 8ft down to service waterheater. Approx 55 ft in total length
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/03/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 11/03/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1125-02006
Permit Status: Inspections
Permit Description: Run new gas line from meter going underground 12ft using polyethylene pipe, going up along side home approx 10ft, running approx 15ft branching off 8ft to feed furnace and 8ft down to service waterheater. Approx 55 ft in total length
| Date | Description | Comments |
|---|---|---|
| 11/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1125-02006
Permit Description: Run new gas line from meter going underground 12ft using polyethylene pipe, going up along side home approx 10ft, running approx 15ft branching off 8ft to feed furnace and 8ft down to service waterheater. Approx 55 ft in total length
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2025 | COT - LCPL - Gas Pressure Test | Passed | 11.5.25 APPROVED System is installed according to plans and holding pressure. |
|
| 11/05/2025 | COT - LCPL - Plumbing Intermediate | Passed | 11.5.25 APPROVED System is installed according to plans and holding pressure. |
|
| 11/05/2025 | COT - LCPL - Plumbing Final | Passed | 11.5.25 APPROVED System is installed according to plans and holding pressure. |
|
| 11/12/2025 | COT - BULD - SWG Clearance | Passed | 11.12.25 |