Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1300 N GREASEWOOD RD
Apply Date:
11/25/2024
Applicant:
Ahmed Rashed
Description:
A replacement of an existing multi purpose building. No Change in occupancy. No change in occupant load.

Permit Reviews

Permit Number - TC-COM-1124-02261
Permit Status: Complete
Permit Description: A replacement of an existing multi purpose building. No Change in occupancy. No change in occupant load.
Start Date Submittal Complete Date Status  
12/05/2024 COMMERCIAL REVIEW - FULL v.1 01/06/2025 REQUIRES RESUBMIT Review Details
03/19/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2025 APPROVED Review Details
02/10/2025 RESTAMP - COMMERCIAL v.1 02/12/2025 APPROVED Review Details
01/31/2025 COMMERCIAL REVIEW - FULL v.2 02/10/2025 APPROVED Review Details
08/25/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/19/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02261
Permite Description: A replacement of an existing multi purpose building. No Change in occupancy. No change in occupant load.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
05/02/2025 COT - BULD - SWG Clearance N/A Not Applicable
05/02/2025 COT - HCBU - Building Progress N/A Not Applicable
05/02/2025 COT - HCPL - Plumbing Progress N/A Not Applicable
05/02/2025 COT - HCBU - Masonry Pregrout N/A Not Applicable
05/02/2025 COT - HCEL - Electrical Progress N/A Not Applicable
05/02/2025 COT - HCME - Mechanical Progress N/A Not Applicable
05/02/2025 COT - HCPL - Plumbing Roof Drains N/A Not Applicable
10/02/2025 COT - FCON - Alarm - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02261
Permit Description: A replacement of an existing multi purpose building. No Change in occupancy. No change in occupant load.
Total Completed Inspections - 27
Date Description Inspector Results Comments
03/10/2025 COT - HCBU - Preslab Passed
03/14/2025 COT - HCBU - Excavation/Rebar/Zoning Passed 3/14/25: reinforcement per plan and Hold-downs set in place at slab on grade.
04/11/2025 COT - HCBU - Roof Nailing Passed
04/11/2025 COT - HCPL - Gas Final Passed
04/11/2025 COT - HCPL - Gas Pressure Test Passed
05/02/2025 COT - HCPL - Rough Soil Passed
05/02/2025 COT - HCBU - Exterior Clips/Sheathing Passed
05/02/2025 COT - HCEL - Electrical Above Ceiling Passed
05/02/2025 COT - HCBU - Framing Passed
05/02/2025 COT - HCEL - Electrical Intermediate Passed
05/02/2025 COT - HCME - Mechanical Above Ceiling Passed
05/02/2025 COT - HCME - Mechanical Intermediate Passed
05/02/2025 COT - HCPL - Plumbing Above Ceiling Passed
05/02/2025 COT - HCPL - Plumbing Intermediate Passed
10/02/2025 COT - HCPL - Plumbing Final Passed
10/02/2025 COT - HCME - Mechanical Final Passed
10/02/2025 COT - HCEL - Outdoor Lighting Passed
10/02/2025 COT - HCEL - Grounding/Bonding Passed
10/02/2025 COT - HCEL - Electrical Underground Passed
10/02/2025 COT - HCEL - Electrical Final Passed
10/02/2025 COT - HCBU - CofO Passed
10/02/2025 COT - HCBU - Building Final Passed
10/02/2025 COT - HCBU - Building Above Ceiling Passed
10/01/2025 TRSP - ROW - Final/Close-Out Passed
10/02/2025 ENGR Engineering Final Passed
10/02/2025 COT - FCON - Fire - Final Passed
10/02/2025 BULD - Electrical Clearance Passed 10/2/2025 power is on. No clearance needed. Electrical system layout has been revised and approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TRINITY CHURCH 25-0806 REV 1_V1.PDF DOCUMENTS VIEW
TRUSS DRAWINGS MOST HOLY_V1.PDF DOCUMENTS VIEW
TRUSS LAYOUT MOST HOLY_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TRINITY CHURCH 25-0106_V2.PDF DOCUMENTS VIEW