Permit: TC-COM-1124-02235
Permit Details
Apply Date:
11/19/2024
Applicant:
Jennifer Vaughan
Description:
Install new single phase 3 meter pack to feed 8G, 8H, and a House Panel. Upgrade the service for unit 8G, 8H, and the house panel from a non water tight panel, to a new 100 amp panel.
Permit Reviews
Permit Number - TC-COM-1124-02235
Permit Status: Inspections complete
Permit Description: Install new single phase 3 meter pack to feed 8G, 8H, and a House Panel.
Upgrade the service for unit 8G, 8H, and the house panel from a non water tight panel, to a new 100 amp panel.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/21/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 11/26/2024 | REQUIRES RESUBMIT |
12/13/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 12/17/2024 | APPROVED |
Conditions
Permit Number - TC-COM-1124-02235
Permit Status: Inspections complete
Permit Description: Install new single phase 3 meter pack to feed 8G, 8H, and a House Panel.
Upgrade the service for unit 8G, 8H, and the house panel from a non water tight panel, to a new 100 amp panel.
Date | Description | Comments |
---|---|---|
12/17/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1124-02235
Permit Description: Install new single phase 3 meter pack to feed 8G, 8H, and a House Panel.
Upgrade the service for unit 8G, 8H, and the house panel from a non water tight panel, to a new 100 amp panel.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2025 | BULD - Electrical Clearance | Passed | Approved 200A 3-meter service panel upgrade - INCR clearance to TEP is required for the cutover of unit H, G, and House panel Pending final - NR |
|
01/29/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
02/26/2025 | COT - LCEL - Electrical Final | Passed |