Permit: TC-COM-1124-02191
Permit Details
Apply Date:
11/14/2024
Applicant:
Candice Mishler
Description:
Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Permit Reviews
Permit Number - TC-COM-1124-02191
Permit Status: Inspections
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/31/2025 | APPROVED |
| 09/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/15/2025 | APPROVED |
| 07/17/2025 | COMMERCIAL REVIEW - FULL v.2 | 07/17/2025 | REQUIRES RESUBMIT |
| 07/18/2025 | COMMERCIAL REVIEW - FULL v.3 | 08/12/2025 | APPROVED |
| 11/14/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/17/2024 | REQUIRES RESUBMIT |
| 08/12/2025 | RESTAMP - COMMERCIAL v.1 | 08/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-1124-02191
Permit Status: Inspections
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/11/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
| 12/02/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 12/02/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 12/02/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-COM-1124-02191
Permit Status: Inspections
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
| Date | Description | Comments |
|---|---|---|
| 11/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/14/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 11/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/14/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1124-02191
Permite Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | Partial pass for roof nailing besides roof access area at tower, checked hold down throughout and checked nailing at tower, ok to cover. |
| 12/12/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 12-12-25: electrical intermediates approved. All penetrations firefoamed and electrical layout per plans. Pending underground electrical to building together with installation of panel and grounding. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1124-02191
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 11/07/2025 | COT - HCPL - Rough Soil | Passed | ||
| 11/20/2025 | COT - HCBU - Preslab | Passed | ||
| 12/11/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 12/11/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 12/18/2025 | COT - HCPL - Plumbing Intermediate | Passed |