Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
3925 E 22ND ST
Address NEW:
3925 E 22ND ST
Apply Date:
11/14/2024
Applicant:
Candice Mishler
Description:
Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.

Permit Reviews

Permit Number - TC-COM-1124-02191
Permit Status: Inspections
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Start Date Submittal Complete Date Status  
10/27/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/31/2025 APPROVED Review Details
09/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/15/2025 APPROVED Review Details
07/17/2025 COMMERCIAL REVIEW - FULL v.2 07/17/2025 REQUIRES RESUBMIT Review Details
07/18/2025 COMMERCIAL REVIEW - FULL v.3 08/12/2025 APPROVED Review Details
11/14/2024 COMMERCIAL REVIEW - FULL v.1 12/17/2024 REQUIRES RESUBMIT Review Details
08/12/2025 RESTAMP - COMMERCIAL v.1 08/14/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1124-02191
Permit Status: Inspections
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Activity Conditions - 4
Date Name
08/11/2025 WATER STERILIZATION REPORT IS REQUIRED.
12/02/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
12/02/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/02/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-COM-1124-02191
Permit Status: Inspections
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/14/2024 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/14/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
12/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1124-02191
Permite Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/09/2025 COT - HCBU - Roof Nailing N/A Partial Pass Partial pass for roof nailing besides roof access area at tower, checked hold down throughout and checked nailing at tower, ok to cover.
12/12/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass 12-12-25: electrical intermediates approved. All penetrations firefoamed and electrical layout per plans. Pending underground electrical to building together with installation of panel and grounding.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1124-02191
Permit Description: Ground Up Construction, including Site Work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Completed Inspections - 6
Date Description Inspector Results Comments
11/06/2025 COT - HCEL - Electrical Underground Passed
11/07/2025 COT - HCPL - Rough Soil Passed
11/20/2025 COT - HCBU - Preslab Passed
12/11/2025 COT - HCBU - Roof Nailing Passed
12/11/2025 COT - HCBU - Exterior Clips/Sheathing Passed
12/18/2025 COT - HCPL - Plumbing Intermediate Passed

Documents

File Name Document Type  
TAKE 5 OIL 22ND ST-293382_AZ_SEALED_V1.PDF DOCUMENTS VIEW
TAKE 5 OIL 3955 E 22ND ST-ROOF TRUSS PLACEMENT PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TAKE 5 22ND STREET. SI CERT.-2025-09-12_V1.PDF DOCUMENTS VIEW
240136_TAKE 5 - TUCZON (22ND STREET), AZ__STRUCTURAL CALCULATIONS PACKET_S-S_V2.PDF DOCUMENTS VIEW
59.6678.025_TAKE 5 - TUCSON_22ND STREET REV 01 07.15.2025_SS_V2.PDF DOCUMENTS VIEW
TAKE 5 OIL CHANGE-22ND STREET GEOTECHNICAL REPORT_V2.PDF DOCUMENTS VIEW
WB694561BKA_V2.PDF DOCUMENTS VIEW