Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/11/2024
Applicant:
Glenn Hamm
Description:
TENANT GHD TUCSON. OFFICE TENANT IMPROVEMENT FOR TENANT GHD IN EXISTING SUITE 1-A1. GHD WILL TAKE 2942 SF OF EXISTING SUITE 1-A1. TOTAL AREA OF REMODELED SPACE IS 10,903.6 SF. NEW OFFICE SPACE, BREAK ROOM, WELLNESS ROOM AND BUSINESS AREAS. RELATED MECHANICAL, PLUMBING AND ELECTRICAL TO BE REWORKED TO SERVE NEW LAYOUT.

Permit Reviews

Permit Number - TC-COM-1124-02164
Permit Status: Complete
Permit Description: TENANT GHD TUCSON. OFFICE TENANT IMPROVEMENT FOR TENANT GHD IN EXISTING SUITE 1-A1. GHD WILL TAKE 2942 SF OF EXISTING SUITE 1-A1. TOTAL AREA OF REMODELED SPACE IS 10,903.6 SF. NEW OFFICE SPACE, BREAK ROOM, WELLNESS ROOM AND BUSINESS AREAS. RELATED MECHANICAL, PLUMBING AND ELECTRICAL TO BE REWORKED TO SERVE NEW LAYOUT.
Start Date Submittal Complete Date Status  
01/06/2025 COMMERCIAL REVIEW - LIMITED v.2 01/14/2025 APPROVED Review Details
11/12/2024 COMMERCIAL REVIEW - LIMITED v.1 12/10/2024 REQUIRES RESUBMIT Review Details
01/14/2025 RESTAMP - COMMERCIAL v.1 01/17/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1124-02164
Permit Status: Complete
Permit Description: TENANT GHD TUCSON. OFFICE TENANT IMPROVEMENT FOR TENANT GHD IN EXISTING SUITE 1-A1. GHD WILL TAKE 2942 SF OF EXISTING SUITE 1-A1. TOTAL AREA OF REMODELED SPACE IS 10,903.6 SF. NEW OFFICE SPACE, BREAK ROOM, WELLNESS ROOM AND BUSINESS AREAS. RELATED MECHANICAL, PLUMBING AND ELECTRICAL TO BE REWORKED TO SERVE NEW LAYOUT.
Date Description Comments
11/12/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
11/12/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02164
Permite Description: TENANT GHD TUCSON. OFFICE TENANT IMPROVEMENT FOR TENANT GHD IN EXISTING SUITE 1-A1. GHD WILL TAKE 2942 SF OF EXISTING SUITE 1-A1. TOTAL AREA OF REMODELED SPACE IS 10,903.6 SF. NEW OFFICE SPACE, BREAK ROOM, WELLNESS ROOM AND BUSINESS AREAS. RELATED MECHANICAL, PLUMBING AND ELECTRICAL TO BE REWORKED TO SERVE NEW LAYOUT.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
02/13/2025 BULD - Electrical Clearance N/A Not Applicable
02/13/2025 COT - BULD - SWG Clearance N/A Not Applicable
02/13/2025 COT - HCPL - Plumbing Roof Drains N/A Not Applicable
02/13/2025 COT - HCPL - Rough Soil N/A Not Applicable
02/13/2025 COT - HCPL - Sewer N/A Not Applicable
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1124-02164
Permit Description: TENANT GHD TUCSON. OFFICE TENANT IMPROVEMENT FOR TENANT GHD IN EXISTING SUITE 1-A1. GHD WILL TAKE 2942 SF OF EXISTING SUITE 1-A1. TOTAL AREA OF REMODELED SPACE IS 10,903.6 SF. NEW OFFICE SPACE, BREAK ROOM, WELLNESS ROOM AND BUSINESS AREAS. RELATED MECHANICAL, PLUMBING AND ELECTRICAL TO BE REWORKED TO SERVE NEW LAYOUT.
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/13/2025 COT - HCBU - Framing Passed
02/13/2025 COT - HCEL - Electrical Intermediate Passed
02/13/2025 COT - HCEL - Outdoor Lighting Passed
02/21/2025 COT - FCON - Alarm - Final Passed
04/14/2025 COT - HCEL - Grounding/Bonding Passed
04/14/2025 COT - HCPL - Plumbing Intermediate Passed
04/14/2025 ENGR Engineering Final Passed
04/14/2025 TRSP - ROW - Final/Close-Out Passed
04/14/2025 COT - HCBU - Building Above Ceiling Passed
04/14/2025 COT - HCBU - Building Final Passed
04/14/2025 COT - HCEL - Electrical Final Passed
04/14/2025 COT - HCEL - Electrical Progress Passed
04/14/2025 COT - HCME - Mechanical Progress Passed
04/14/2025 COT - HCEL - Electrical Underground Passed
04/14/2025 COT - HCME - Mechanical Above Ceiling Passed
04/14/2025 COT - HCME - Venting Passed
04/14/2025 COT - HCME - Mechanical Final Passed
04/14/2025 COT - HCPL - Plumbing Progress Passed
04/14/2025 COT - HCPL - Plumbing Above Ceiling Passed
04/14/2025 COT - HCME - Mechanical Intermediate Passed
04/14/2025 COT - HCPL - Plumbing Final Passed
04/16/2025 COT - FCON - Fire - Final Passed
04/16/2025 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-24048- GHD TUCSON_PERMITSET_2501_06_V2.PDF DOCUMENTS VIEW