Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
8730 E BROADWAY BL
Apply Date:
11/05/2024
Applicant:
Morgan Florida
Description:
Retail store tenant fitout. please reference Development Package permit number TD-DEV-1124-00299

Permit Reviews

Permit Number - TC-COM-1124-02119
Permit Status: Inspections complete
Permit Description: Retail store tenant fitout. please reference Development Package permit number TD-DEV-1124-00299
Start Date Submittal Complete Date Status  
04/03/2025 COMMERCIAL REVIEW - FULL v.4 04/08/2025 APPROVED Review Details
04/08/2025 RESTAMP - COMMERCIAL v.1 04/15/2025 APPROVED Review Details
02/13/2025 COMMERCIAL REVIEW - FULL v.3 03/13/2025 REQUIRES RESUBMIT Review Details
11/05/2024 COMMERCIAL REVIEW - FULL v.1 12/04/2024 REQUIRES RESUBMIT Review Details
01/28/2025 COMMERCIAL REVIEW - FULL v.2 02/12/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1124-02119
Permit Status: Inspections complete
Permit Description: Retail store tenant fitout. please reference Development Package permit number TD-DEV-1124-00299
Date Description Comments
11/05/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1124-02119
Permite Description: Retail store tenant fitout. please reference Development Package permit number TD-DEV-1124-00299
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
04/25/2025 COT - HCBU - Preslab N/A Partial Pass existing floor cut outs
05/07/2025 COT - HCBU - Exterior Clips/Sheathing N/A Not Applicable
06/05/2025 BULD - Electrical Clearance N/A Not Applicable already connected
06/05/2025 COT - BULD - SWG Clearance N/A Not Applicable already connected
06/05/2025 COT - FCON - Alarm - Final N/A Partial Pass Duct detectors still need to be tied in.
06/10/2025 COT - HCEL - Electrical Final N/A Canceled
06/10/2025 COT - HCBU - Building Final N/A Canceled
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-1124-02119
Permit Description: Retail store tenant fitout. please reference Development Package permit number TD-DEV-1124-00299
Total Completed Inspections - 26
Date Description Inspector Results Comments
04/24/2025 COT - HCPL - Plumbing Progress Passed Underground
04/24/2025 COT - HCPL - Gas Pressure Test Passed
04/24/2025 COT - HCPL - Rough Soil Passed
05/01/2025 COT - HCBU - Framing Passed
05/01/2025 COT - HCEL - Electrical Intermediate Passed
05/07/2025 COT - HCBU - Preslab Passed
05/12/2025 COT - HCPL - Plumbing Intermediate Passed
06/02/2025 COT - FCON - Sprinkler - Final Passed
06/02/2025 COT - HCBU - Building Above Ceiling Passed
06/03/2025 COT - HCBU - Building Progress Passed
06/03/2025 COT - HCEL - Electrical Progress Passed
06/03/2025 COT - HCME - Mechanical Progress Passed
06/04/2025 COT - HCPL - Plumbing Final Passed
06/05/2025 COT - HCEL - Electrical Above Ceiling Passed
06/05/2025 COT - HCME - Mechanical Above Ceiling Passed
06/05/2025 COT - HCPL - Plumbing Above Ceiling Passed
06/05/2025 COT - HCME - Mechanical Intermediate Passed
06/05/2025 COT - HCME - Mechanical Final Passed
06/06/2025 TRSP - ROW - Final/Close-Out Passed
06/10/2025 COT - FCON - Alarm - Final Passed
06/12/2025 COT - HCEL - Electrical Final Passed
06/12/2025 COT - HCBU - Building Final Passed
06/12/2025 COT - HCBU - TCO Passed OK for C of O.
06/23/2025 ENGR Engineering Final Passed Site is safe and clean. Everything is in accordance with approved plans. Outside is approved for CofO, no issues with a TCO lv.4
07/09/2025 COT - FCON - Fire - Final Passed
07/21/2025 COT - HCBU - CofO Passed