Permit: TC-COM-1123-02759
Permit Details
Apply Date:
11/30/2023
Applicant:
Danny Foster
Description:
The bid price is to include running a new 1” black iron gas line to the pro shop furnace from the existing gas line on the roof. The previous line was put under test and failed air drop test and has a leak. The bid includes a city drawing, permit and inspection. The bid excludes any other plumbing, new fixtures, or anything else not listed on the bid above. If the customer needs any additional work another price will be given.
Permit Reviews
Permit Number - TC-COM-1123-02759
Permit Status: Issued
Permit Description: The bid price is to include running a new 1” black iron gas line to the pro shop furnace from the existing gas line on the roof. The previous line was put under test and failed air drop test and has a leak. The bid includes a city drawing, permit and inspection.
The bid excludes any other plumbing, new fixtures, or anything else not listed on the bid above. If the customer needs any additional work another price will be given.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/30/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 12/07/2023 | REQUIRES RESUBMIT |
| 12/15/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 12/18/2023 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1123-02759
Permit Description: The bid price is to include running a new 1” black iron gas line to the pro shop furnace from the existing gas line on the roof. The previous line was put under test and failed air drop test and has a leak. The bid includes a city drawing, permit and inspection.
The bid excludes any other plumbing, new fixtures, or anything else not listed on the bid above. If the customer needs any additional work another price will be given.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 12/20/2023 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test, SWG Clearance is required for the meter reconnection | |
| 12/20/2023 | COT - LCPL - Gas Pressure Test | Passed |