The Drawing Studio PV System will consist of 21 SILFAB 500W modules. Six grid-tied microinverters will supply power through existing TEP service. All modules will be roof-mounted.
Permit Reviews
Permit Number - TC-COM-1123-02725
Permit Status: Complete
Permit Description: The Drawing Studio PV System will consist of 21 SILFAB 500W modules. Six grid-tied microinverters will supply power through existing TEP service. All modules will be roof-mounted.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/18/2024 | RESTAMP - COMMERCIAL v.1 | 01/23/2024 | APPROVED |
| 11/29/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/22/2023 | REQUIRES RESUBMIT |
| 01/10/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/18/2024 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1123-02725
Permit Description: The Drawing Studio PV System will consist of 21 SILFAB 500W modules. Six grid-tied microinverters will supply power through existing TEP service. All modules will be roof-mounted.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2024 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 03/06/2024 | COT - LCBU - Building Final | Passed | ||
| 03/06/2024 | ENGR Engineering Final | Passed | ||
| 03/06/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/06/2024 | COT - CSOL - Electrical Progress Solar Project | Passed | ||
| 03/06/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 03/06/2024 | BULD - Electrical Clearance | Passed | Power kill for solar LST complete. DGL clearance called into TEP at 10:30 |