Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/22/2023
Applicant:
Janelle Lavoie
Description:
Tenant Improvement - Dental Office

Permit Reviews

Permit Number - TC-COM-1123-02714
Permit Status: Complete
Permit Description: Tenant Improvement - Dental Office
Start Date Submittal Complete Date Status  
11/24/2023 COMMERCIAL REVIEW - FULL v.1 12/20/2023 APPROVED Review Details
07/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1123-02714
Permit Status: Complete
Permit Description: Tenant Improvement - Dental Office
Date Description Comments
12/04/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
12/04/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/04/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02714
Permite Description: Tenant Improvement - Dental Office
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/11/2024 COT - BULD - SWG Clearance N/A Not Applicable
03/11/2024 COT - HCEL - Electrical Progress N/A Not Applicable
03/11/2024 COT - HCME - Mechanical Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1123-02714
Permit Description: Tenant Improvement - Dental Office
Total Completed Inspections - 15
Date Description Inspector Results Comments
03/11/2024 COT - HCBU - Building Progress Passed
03/11/2024 COT - HCEL - Grounding/Bonding Passed
03/22/2024 COT - HCEL - Electrical Above Ceiling Passed Electrical rough-in above ceiling is complete, conduit and boxes are properly secured and labeled. Okay to proceed with ceiling tiles.
03/22/2024 COT - HCBU - Building Above Ceiling Passed Mechanical, plumbing, and electrical rough-in is complete above ceiling. Okay to proceed with ceiling tiles.
03/22/2024 COT - HCME - Mechanical Above Ceiling Passed Mechanical, plumbing, and electrical rough-in is complete above ceiling. Okay to proceed with ceiling tiles.
04/05/2024 BULD - Electrical Clearance Passed SUITE # 120, 2nd meter associated with this permit is #120

meters 100, and 120 both serve the same suite and are existing; please clear both meters.
05/20/2024 COT - HCBU - Framing Passed
05/20/2024 COT - HCME - Venting Passed
05/20/2024 COT - FCON - Fire - Final Passed
05/28/2024 ENGR Engineering Final Passed ADA parking is not within compliance, slope is at %4. This is not part of this inspection. Suite is ready for CO.
05/28/2024 TRSP - ROW - Final/Close-Out Passed
07/02/2024 COT - HCME - Mechanical Final Passed
08/09/2024 COT - HCBU - Building Final Passed
08/09/2024 COT - HCBU - CofO Passed
08/09/2024 COT - HCEL - Electrical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
EDENTAL HVAC BALANCE_V1.PDF DOCUMENTS VIEW
FINAL REPORT 2406-084 PHILLIP'S PLUMBING-2024-07-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1_PLANS (E DENTAL TI)_V1.PDF DOCUMENTS VIEW