Permit: TC-COM-1123-02690
Permit Details
Apply Date:
11/18/2023
Applicant:
Powell Minnis
Description:
BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
Permit Reviews
Permit Number - TC-COM-1123-02690
Permit Status: Complete
Permit Description: BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2024 | RESTAMP - COMMERCIAL v.1 | 01/19/2024 | APPROVED |
04/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/01/2024 | REQUIRES RESUBMIT |
11/21/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/18/2023 | REQUIRES RESUBMIT |
05/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/08/2024 | APPROVED |
04/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/23/2024 | APPROVED |
01/11/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/17/2024 | APPROVED |
01/24/2024 | RESTAMP - COMMERCIAL v.1 | 02/06/2024 | APPROVED |
12/20/2023 | COMMERCIAL REVIEW - FULL v.2 | 12/27/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1123-02690
Permit Status: Complete
Permit Description: BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
Date | Description | Comments |
---|---|---|
11/21/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
01/17/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
11/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
01/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
01/17/2024 | Masonry Inspection Report submittal review is required. | |
01/17/2024 | Racking Designs must be submitted and approved prior to final. | |
01/17/2024 | Post-Installed Anchor Inspection Report is required. | |
01/17/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
01/17/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1123-02690
Permite Description: BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2024 | COT - HCBU - Framing | N/A | Partial Pass | 2/16/24 partial for demising wall, ok to continue one side to ceiling and insulate need to verify fire seal at top deck 2/22/24: drywall nailing at demising wall west half per plan ok to insulate and proceed on east half. |
03/18/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 3/18/24: plumbing rough-in in rooms 101,102,103,104,105,106,107,108,109,110 passed. |
04/22/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
03/18/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 3/18/24: electrical in wall rough-in in rooms 101,102,103,104,105,106,107,108,109,110 passed. |
04/22/2024 | COT - HCBU - Building Above Ceiling | N/A | Re-inspection required | 4/4/24 partial approval for above ceiling men's and women's restrooms OK to insulate and drywall 4/22/24: Mechanical above ceiling pending. Support on flex missing throughout, support at registers missing throughout, exhaust fan at IT/Storage not complete, transfer air grille not installed at IT/Storage (will check at final). |
03/26/2024 | COT - HCPL - Gas Final | N/A | Not Ready | |
04/25/2024 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | 4/25/24: Water heater not installed per plans, Expansion tank at water heater obstructs the shutoff valve at water heater, Urinal at men's bathroom not installed, exhaust termination at roof not complete, refrigerant lines at roof need proper mechanical straps to hold electrical whip to refrigerant lines (zip ties are not allowed), rain caps required at refrigerant jacks at roof they must also be sealed, UV protect exterior piping, Mechanical not complete on roof, |
04/25/2024 | ENGR Engineering Final | N/A | Partial Pass | This is a partial pass with a TCO4, we will not release full pass until it is decided on how to handle the issue with the remodeling of trash enclosure. Also environmental services will have to approve for the use of the 40yrd dumpster. |
05/15/2024 | COT - HCBU - Building Final | N/A | Not Ready | 4/26/24: LEVEL 4 TCO 5/15/24: pending engineering final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1123-02690
Permit Description: BLDG 3 - a tenant finish for an existing one story single sided dock warehouse / distribution building
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/09/2024 | COT - HCPL - Rough Soil | Passed | 2/8/24: plumbing underground per plans ok to backfill. | |
02/09/2024 | COT - HCEL - Electrical Underground | Passed | 2/9/24: electrical underground passed | |
03/14/2024 | COT - HCBU - Preslab | Passed | ||
03/14/2024 | COT - HCBU - Framing | Passed | 2/16/24 partial for demising wall, ok to continue one side to ceiling and insulate need to verify fire seal at top deck 2/22/24: drywall nailing at demising wall west half per plan ok to insulate and proceed on east half. 3/14/24: framing passed ok to proceed. |
|
03/18/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
04/22/2024 | COT - LCPL - Gas Pressure Test | Passed | ||
04/22/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
04/22/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
04/22/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
04/23/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
04/25/2024 | COT - HCEL - Electrical Final | Passed | ||
04/25/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
04/26/2024 | COT - BULD - SWG Clearance | Passed | ||
04/25/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
04/25/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
04/25/2024 | COT - HCPL - Gas Final | Passed | ||
04/25/2024 | COT - FCON - Sprinkler - Final | Passed | ||
04/26/2024 | COT - HCPL - Plumbing Final | Passed | ||
04/26/2024 | COT - FCON - Alarm - Final | Passed | ||
04/26/2024 | COT - FCON - Fire - Final | Passed | ||
04/30/2024 | COT - HCME - Mechanical Final | Passed | ||
05/23/2024 | ENGR Engineering Final | Passed | Dumpster enclosure modification approved by Andy Vera of Environmental Services. Note will be added to DP22-0149 that enclosure modification should be included on any future revision. | |
05/23/2024 | COT - HCBU - Building Final | Passed | 4/26/24: LEVEL 4 TCO 5/15/24: pending engineering final. 5/23/24: ok for CofO |