Permit: TC-COM-1123-02638
Permit Details
Apply Date:
11/10/2023
Applicant:
Kerri Drown
Description:
Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Permit Reviews
Permit Number - TC-COM-1123-02638
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/16/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/12/2023 | REQUIRES RESUBMIT |
| 06/05/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/08/2024 | REQUIRES RESUBMIT |
| 01/18/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/19/2024 | REQUIRES RESUBMIT |
| 07/10/2024 | COMMERCIAL REVIEW - FULL v.3 | 07/12/2024 | APPROVED |
| 03/01/2024 | RESTAMP - COMMERCIAL v.1 | 03/07/2024 | APPROVED |
| 02/01/2024 | COMMERCIAL REVIEW - FULL v.4 | 02/05/2024 | REQUIRES RESUBMIT |
| 07/12/2024 | RESTAMP - COMMERCIAL v.1 | 07/30/2024 | REQUIRES RESUBMIT |
| 01/31/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/31/2024 | REQUIRES RESUBMIT |
| 12/12/2024 | COMMERCIAL REVIEW - FULL v.3 | 12/16/2024 | APPROVED |
| 07/10/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/10/2024 | REQUIRES RESUBMIT |
| 12/16/2024 | RESTAMP - COMMERCIAL v.2 | 12/17/2024 | REQUIRES RESUBMIT |
| 12/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/26/2024 | APPROVED |
| 02/28/2024 | COMMERCIAL REVIEW - FULL v.5 | 03/01/2024 | APPROVED |
| 12/17/2024 | RESTAMP - COMMERCIAL v.1 | 12/17/2024 | APPROVED |
| 10/17/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/22/2024 | REQUIRES RESUBMIT |
| 08/23/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/26/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1123-02638
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
| Date | Description | Comments |
|---|---|---|
| 12/24/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 11/16/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/24/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/01/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
| 12/18/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/24/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1123-02638
Permite Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2024 | BULD - Electrical Clearance | N/A | Not Applicable | Already connected. |
| 08/09/2024 | COT - BULD - SWG Clearance | N/A | Not Ready | |
| 08/09/2024 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | pending condition resolution. |
| 08/09/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | pending condition resolution. |
| 08/09/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | pending condition resolution |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1123-02638
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2024 | COT - HCBU - Preslab | Passed | ||
| 07/10/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 07/10/2024 | COT - HCBU - Framing | Passed | ||
| 07/10/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/10/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/10/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 08/23/2024 | ENGR Engineering Final | Passed | ||
| 08/12/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/13/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 08/22/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 08/22/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
| 08/22/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/22/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 08/30/2024 | COT - HCEL - Electrical Final | Passed | ||
| 08/30/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 08/30/2024 | COT - HCME - Mechanical Final | Passed | ||
| 09/05/2024 | COT - HCBU - Building Final | Passed | ||
| 09/05/2024 | COT - FCON - Fire - Final | Passed |